eATM Portal

FCM04.2 — Short Term ATFCM Measures (STAM) - Phase 2

NOTE: the STAM CONOPS mentioned in this document includes both STAM Phase 1 and Phase 2.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2019
Stakeholders
Air Navigation Service Provider / Airspace Users / Network Manager
Type
PCP
Scope
ECAC+
Status
Active

Context

Applicability Area(s) and Timescales

Applicability Area 1:
All EU SES States. Plus: United Kingdom
Applicability Area 2:
Albania, Azerbaijan, Bosnia and Herzegovina, Montenegro, North Macedonia, Serbia, Turkey, Ukraine
Timescales From By Applicable to
Initial operational capability 01-11-2017 Applicability Area 1
Full operational capability 31-12-2021 Applicability Area 1 + Applicability Area 2

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2019
Operating Environments
En-Route
Network

Expected Performance Benefits

Safety
Small enhancement through the resolution of some conflicts through STAM measures.
Capacity
Effective capacity is globally optimised thanks to replacement of some ATFCM regulations with the STAM measures, hotspot reduction and its more efficient management.
Operational efficiency
Improved through the proposition of the most appropriate measures according with the type of flight.
Cost efficiency
-
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Develop STAM procedures and upgrade the local systems
  • 01-11-2017
  • 31-12-2021
 
ASP02 Use of STAM phase 2
  • 01-11-2017
  • 31-12-2021
 
ASP03 Train the personnel
  • 01-11-2017
  • 31-12-2021
 
USE01 Airspace Users to deploy the appropriate tools and associated procedures
  • 01-11-2017
  • 31-12-2021
 
NM01 Update the NM systems and develop the associated procedures
  • 01-11-2017
  • 31-12-2021
 
NM02 Train the personnel
  • 01-11-2017
  • 31-12-2021
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM04.2
 
20171101_20211231
ASP01
 
13%
20171101_20211231
ASP02
 
9%
20171101_20211231
ASP03
 
17%
20171101_20211231
USE01
 
20171101_20211231
NM01
 
20171101_20211231
NM02
 
20171101_20211231

Supporting Material

Title Related SLoAs

EUROCONTROL - NM STAM CONOPS

-

ASP01, ASP02, NM01, NM02, USE01

EUROCONTROL - NM STAM coordination procedures (Common set of ATFCM-STAM procedures including roles & responsibilities allowing for effective STAM measure execution)

-

ASP01, ASP02, NM01, USE01

SJU - SESAR Solution 17: Data Pack for advanced Short ATFCM Measures (STAM)

https://www.sesarju.eu/sesar-solutions/advanced-short-term-atfcm-measures-stams

ASP01, ASP02, ASP03, NM01, NM02, USE01

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
Latest objective review at expert level
05/2016
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
09/2016
Latest change to objective approved/endorsed in