eATM Portal

AOM19.4 — Management of Pre-defined Airspace Configurations

NOTE that there is no OI Step covering the implementation of pre-defined airspace configurations so a Change Request has been raised for the Master Plan Level 2 to address this gap.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2019
Stakeholders
Air Navigation Service Provider / Network Manager
Type
SESAR
Scope
ECAC+
Status
Active

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area:
All ECAC States except: Armenia, Georgia, Luxembourg, Malta, Moldova, North Macedonia. Plus: Israel
Timescales From By Applicable to
Initial operational capability 01-01-2018 Applicability Area
Full operational capability 31-12-2021 Applicability Area

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

References

Applicable legislation
- Regulation (EC) No 2150/2005 of 23 December 2005 on Implementation and Application of the Flexible Use of Airspace
- Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2019
Operating Environments
Terminal Airspace
En-Route
Network

Expected Performance Benefits

Safety
-
Capacity
Increased through better utilisation of airspace resources within and across airspace boundaries leading to reduction of flight delays.
Operational efficiency
Increased through the availability of more optimum routes/trajectories allowing lower fuel burn.
Cost efficiency
-
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Adapt ATM systems to support the management of ASM solutions and pre-defined airspace configurations.
  • 01-01-2018
  • 31-12-2021
 
ASP02 Implement procedures in support of an improved ASM solution process and pre-defined airspace configurations
  • 01-01-2018
  • 31-12-2021
 
NM01 Adapt NM systems to support the management of pre-defined airspace configurations
  • 01-01-2018
  • 31-12-2021
 
NM02 Implement procedures in support of an improved ASM solution process and the management of pre-defined airspace configurations
  • 01-01-2018
  • 31-12-2021
 
NM03 Implement tools in support of ASM performance analysis
  • 01-01-2018
  • 31-12-2021
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOM19.4
 
20180101_20211231
ASP01
 
17%
20180101_20211231
ASP02
 
19%
20180101_20211231
NM01
 
20180101_20211231
NM02
 
20180101_20211231
NM03
 
20180101_20211231

Supporting Material

Title Related SLoAs

EUROCONTROL - Advanced FUA Concept - Edition 1.0

http://www.eurocontrol.int/sites/default/files/publication/files/advanced-fua-concept-v1.0-sept-2015.pdf

ASP01, ASP02, NM01, NM02, NM03

EUROCONTROL - European Route Network Improvement Plan (ERNIP) Part 3 - Airspace Management Handbook - Guidelines for Airspace Management - 5.5 / 11/2017

https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-3

ASP01, ASP02, NM01, NM02, NM03

EUROCONTROL - SPEC 112 - EUROCONTROL Specifications for the application of the Flexible Use of Airspace (FUA) - Edition 1.1 - OJ 2009/C 196/05 / 01/2009

https://www.eurocontrol.int/publication/eurocontrol-specification-application-flexible-use-airspace-fua

ASP01, ASP02, NM01, NM02, NM03

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
Latest objective review at expert level
05/2018
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
Latest change to objective approved/endorsed in