eATM Portal

AOM18 — Implement ATS Route Network (ARN) - Version 6

Develop, validate and implement ARN Version 6 in accordance with Advance Airspace Scheme principles and taking into account military requirements to further optimise airspace structures (route/sector and terminal airspace) across airspace boundaries between States and better align routes and sectors with traffic flows to facilitate flexible and dynamic airspace capacity management and offer route options closer to the preferred route. Include development and validation of pre-defined routing and sector configuration scenarios in support of D-MEAN

-

Edition
2022
Stakeholders
Air Navigation Service Provider / Military / Airspace Users / International Organisations and Regional Bodies
Type
ECIP
Scope
Pan European
Status
Achieved

Context

Applicability Area(s) and Timescales

APP AREA:
All ECAC States
Timescales From By Applicable to
Initial operational capability 01-10-2007 - APP AREA
Full operational capability - 31-12-2009 APP AREA

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Regulation (EC) No 549/2004 of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation)
Applicable ICAO Annexes and other references
Enhanced FUA and dynamic flight plan processing.
Deployment Programme 2022
-
Operating Environments
En-Route
Network

Expected Performance Benefits

Safety
Some enhancement through reduction in controller workload.
Capacity
Increased through reduction in conflict points, and specialisation of routes and sectors to enhance productivity and reduce controller workload.
Operational efficiency
-
Cost efficiency
Savings in route distances in some States as well as better fuel efficiency through increased use of preferred flight profiles and improved sectorisation.
Environment
Reductions in emissions through use of more optimal routes.
Security
-
  Code Title From By Related Enablers
 
ASP01 Implement national route structure changes
  • 01-10-2007
  • 31-12-2009
 
ASP02 Ensure compatibility of en-route and terminal airspace
  • 01-09-2006
  • 31-12-2008
 
USE01 Adapt flight planning
  • 01-09-2006
  • 31-12-2009
 
INT01 Amend EUR Regional Plan
  • 04-07-2014
  • 31-12-2009
 
AGY01 Develop and validate ARN V6 FINALISED
 
AGY02 Adapt ATFM processes and procedures FINALISED
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOM18
 
20071001_20091231
ASP01
 
20071001_20091231
ASP02
 
20060901_20081231
USE01
 
20060901_20091231
INT01
 
20091231_20140704
AGY01 (FINALISED)
20060901_20081231
AGY02 (FINALISED)
20060901_20081231

Supporting Material

Title Related SLoAs

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
-
Latest objective review at expert level
10/2007
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
07/2004
Latest change to objective approved/endorsed in
07/2005