eATM Portal

FCM06.1 — Automated Support for Traffic Complexity Assessment and Flight Planning interfaces

The Traffic Complexity tool continuously monitors and evaluates current and expected traffic loads and estimates the impact of traffic complexity on controllers’ workload.

The predicted complexity enables ATFCM to take timely action to adjust capacity or request the traffic profile changes in coordination with Network Manager, ATC and airspace users.

The rigid application of ATFCM regulations based on standard demand thresholds as the pre-dominant tactical capacity measure needs to be replaced by a dynamic working relationship between ANSPs and Network Manager, which evolves towards monitoring of the real controller’s workload, the resulting sector capacity and their dynamic management.

As the Trajectory predictability is crucial for complexity management, this objective also addresses the FF-ICE Release 1 implementation and message exchange between NM systems and operational Stakeholders in respect of collaborative flight planning, improving flight plan distribution and enhanced tactical flow management.

This encompasses the exchanges of following messages between NM systems, ATC systems and AU systems such as:

• ATC Flight Plan Proposal (AFP);
• ATC Flight Plan Change message (ACH);
• ATC Flight Plan message (APL);
• eFPL based on FF-ICE.

ANSPs shall provide the automatic AFPs in cases of tactical trajectory changes and process the APL/ACH data from IFPS. The NM system needs to integrate the automatic AFPs from ATC systems. The eFPL will include the 4D trajectory of the flight, as well as flight performance data, in addition to ICAO 2012 FPL data. The first phase should address only the exchange of eFPL between AUs and NM.

The eFPLs distribution will be exploited when ANSP’s transition to FF-ICE provisions is achieved, transition that is not considered as mandatory within this objective.

System requirements:

Concerning the traffic complexity tools, it is suggested that ANSPs develop the concept for the complexity tools utilisation before considering the procurement/upgrades of ATM systems with this functionality.

ANSPs have two options:

• Use NM tools and systems
• Develop and install a local traffic complexity tool and connect with NM via the NM B2B Services;

The system requirements below are related to the second option of local traffic complexity tool:

• The Traffic Complexity tool continuously monitors and evaluates current and expected traffic loads and estimates controller’s workload.
• It provides a support in the determination of solutions in order to plan airspace, sectors and staff to handle the predicted traffic. It is suggested that ANSPs develop concept for the complexity tools utilisation before considering the procurement/upgrades of ATM systems with this functionality;
• The local complexity tools need to receive process and integrate the EFD (or the NM B2B Services flight updates) provided by NM. This is required in order to supplement the local traffic counts with the flight plan data from ETFMS;
• Additionally, the use of the NM B2B Services for the reception/processing of NM traffic counts and for the provision of traffic monitoring values to NM might also need to be envisaged.

The NM systems adaptation activities:

• Deal with improving the quality of the planned trajectory (processing of tactical ATC information, processing of eFPL, support to mixed mode operations, implementation of traffic count methodologies that do not impact trajectory calculation) thus enhancing NM complexity assessment.
• Implementation of tools in support of traffic complexity will rely on the planned trajectory and allows simulating options optimising the use of available capacity. This will help NM operations identify possible mitigation strategies to be applied at network or local level, in coordination with FMPs and airspace users if applicable.

AFP, APL and ACH

• ANSPs automatically provide AFP message to NM
• The local ATC system shall be capable to process APL and ACH messages sent by IFPS in order to exploit the full benefits of AFP distribution to NM.
• NM systems shall integrate the received AFP and provide APL/ACH messages.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Network Manager
Type
CP1
Scope
ECAC+
Status
Active

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area 1:
All EU SES States
(All EU SES States)
Applicability Area 2:
Albania, Armenia, Bosnia and Herzegovina, Georgia, Israel, Moldova, Montenegro, Morocco, North Macedonia, Serbia, Türkiye, Ukraine, United Kingdom
Timescales From By Applicable to
Initial Operational Capability 01-01-2021 Applicability Area 1 + Applicability Area 2
Full Operational Capability / Target date 31-12-2022 Applicability Area 1 + Applicability Area 2

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Regulation (EU) No 2019/123 laying down detailed rules for the implementation of air traffic management (ATM) network functions and repealing Regulation (EU) No 677/2011 Regulation (EU) 2021/116 on the establishment of the Common Project One
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
Family 4.3.1 - Automated Support for Traffic Complexity Assessment and Flight Planning Interfaces
Operating Environments

Expected Performance Benefits

Safety
Enhanced safety.
Capacity
Increased ATC capacity.
Operational efficiency
-
Cost efficiency
Increased cost efficiency. Reduced fuel and emissions.
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Automatically provide AFP for airborne flights
  • 01-01-2021
  • 31-12-2022
 
ASP02 Processing of APL and ACH messages
  • 01-01-2021
  • 31-12-2022
 
ASP03 Use NM systems for traffic complexity management
  • 01-01-2021
  • 31-12-2022
 
ASP04 Implement Local Traffic Complexity tool
  • 01-01-2021
  • 31-12-2022
 
ASP05 Process and Integrate EFD for Local Traffic Complexity Tool
  • 01-01-2021
  • 31-12-2022
 
ASP06 Local Traffic Complexity procedures
  • 01-01-2021
  • 31-12-2022
 
ASP07 Safety Assessment
  • 01-01-2021
  • 31-12-2022
 
ASP08 Training
  • 01-01-2021
  • 31-12-2022
 
ASP09 Operational use
  • 01-01-2021
  • 31-12-2022
 
NM01 Implement Traffic Complexity supporting tools
  • 01-01-2021
  • 31-12-2022
 
NM02 Provide flight update information
  • 01-01-2021
  • 31-12-2022
 
NM03 Integration of Automatic AFP in NM systems
  • 01-01-2021
  • 31-12-2022
 
NM04 Upgrade the NM systems related to FF-ICE Release 1
  • 01-01-2021
  • 31-12-2022
 
NM05 Safety Assessment
  • 01-01-2021
  • 31-12-2022
 
NM06 Training
  • 01-01-2021
  • 31-12-2022
 
NM07 Operational use
  • 01-01-2021
  • 31-12-2022
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM06.1
 
20210101_20221231
ASP01
 
73%
20210101_20221231
ASP02
 
86%
20210101_20221231
ASP03
 
34%
20210101_20221231
ASP04
 
43%
20210101_20221231
ASP05
 
37%
20210101_20221231
ASP06
 
49%
20210101_20221231
ASP07
 
45%
20210101_20221231
ASP08
 
49%
20210101_20221231
ASP09
 
47%
20210101_20221231
NM01
 
20210101_20221231
NM02
 
20210101_20221231
NM03
 
20210101_20221231
NM04
 
20210101_20221231
NM05
 
20210101_20221231
NM06
 
20210101_20221231
NM07
 
20210101_20221231

Supporting Material

Title Related SLoAs

SDM - Standardisation and Regulation support to CP1 deployment 2021, Deliverable D1.1.1 07/2021

https://www.sesardeploymentmanager.eu/publications/deployment-programme

ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, ASP07, ASP08, ASP09, NM01, NM02, NM03, NM04, NM05, NM06, NM07

Consultation & Approval

Working Arrangement in charge
-
Outline description approved in
Latest objective review at expert level
Commitment Decision Body
-
Objective approved/endorsed in
Latest change to objective approved/endorsed in