eATM Portal

FCM10 — Interactive Rolling NOP

The rolling view of the network situation and the support to the collaborative processes is based on an information management platform, accessible online by all stakeholders for consultation, (not only passive but including dialogue opportunities) and updated as and when needed, in a secure and tailored way.

An initial implementation of the Interactive Rolling NOP was achieved through the deployment of the NOP Portal. The scope of this objective consists of the implementation of a platform that uses the state-of-the-art technologies.

This platform supports the network collaborative rolling processes from strategic to real-time operations, including capabilities for online performance monitoring integrated and feeding back into the collaborative network planning. The platform provides both a workplace tool, as well as system interfaces to allow integration in the stakeholders’ own systems. Access to information is provided in a secure way, tailored according to the stakeholders needs and subject to access control rules, so that only those who have an operational need to access particular information are able to do so.

The platform allows building the Rolling NOP through a continuous exchange between the Network Manager and the operational stakeholders.

The Target Time (TT) management is an important part of Collaborative NOP. NM systems shall be able to derive the TT from the trajectory and the constraint and adjust calculated take-off times (‘CTOT’) based on refined and agreed TTs. NM shall assess the network impact of TT proposals, facilitate the coordination process if required, and transmit (updated) CTOT/TT messages to operational stakeholders. This process will be limited to the planning phase and transmission of updated CTOT. Operational Stakeholders need to be capable of receiving and processing these TT’s.

ANSPs/AUs might foresee some adaptation of their systems for reception and handling of TTs. Where agreed, TT information will be used by flight crew and ATC in executive operations.

System requirements:

For NM:

• Provision of the NM technical platform and services for supporting collaborative NOP;
• Development of required NM B2B Services;
• Develop procedures handling the collaborative NOP updates (e.g. capacities values, runway configurations);
• Provision of TT by slot allocation and revision messages.

For ANSPs, Airports and AUs:

• Use of NM technical platform and services for supporting collaborative NOP;
• Use of the NM B2B Services (if required) for interaction with collaborative NOP;
• Develop procedures to provide updates to collaborative NOP (e.g. capacities values, runway configurations);
• Reception and handling of TT for ATFCM purposes.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Airport Operator / Airspace Users / Network Manager
Type
CP1
Scope
ECAC+
Status
Active

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area 1:
All EU SES States
(All EU SES States)
Applicability Area 2:
Israel
Timescales From By Applicable to
Initial Operational Capability 01-01-2021 Applicability Area 1 + Applicability Area 2
Full Operational Capability / Target Date 31-12-2023 Applicability Area 1 + Applicability Area 2

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Regulation (EU) 2021/116 on the establishment of the Common Project One
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
Family 4.2.1 - Interactive Rolling NOP
Operating Environments

Expected Performance Benefits

Safety
Improved information sharing. Enhanced safety.
Capacity
Enhanced predictability. Increased capacity.
Operational efficiency
-
Cost efficiency
Improved situational awareness.
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Use of NM technical platform and NM B2B service
  • 01-01-2021
  • 31-12-2023
 
ASP02 Develop and implement procedures for interaction with the NOP
  • 01-01-2021
  • 31-12-2023
 
ASP03 Adapt systems to receive TT for ATFCM purposes
  • 01-01-2021
  • 31-12-2023
 
ASP04 Safety assessment
  • 01-01-2021
  • 31-12-2023
 
ASP05 Training
  • 01-01-2021
  • 31-12-2023
 
ASP06 Operational use
  • 01-01-2021
  • 31-12-2023
 
APO01 Use of NM technical platform and NM B2B service
  • 01-01-2021
  • 31-12-2023
 
USE01 Implement procedures and processes in reception of Target Time
  • 01-01-2021
  • 31-12-2023
 
NM01 Enhance the NM technical platform and services
  • 01-01-2021
  • 31-12-2023
 
NM02 Develop Network Manager B2B services
  • 01-01-2021
  • 31-12-2023
 
NM03 Implement the Collaborative NOP procedures
  • 01-01-2021
  • 31-12-2023
 
NM04 Adapt NM systems to support Target Time sharing
  • 01-01-2021
  • 31-12-2023
 
NM05 Safety Assessment
  • 01-01-2021
  • 31-12-2023
 
NM06 Training
  • 01-01-2021
  • 31-12-2023
 
NM07 Operational use
  • 01-01-2021
  • 31-12-2023
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM10
 
20210101_20231231
ASP01
 
48%
20210101_20231231
ASP02
 
37%
20210101_20231231
ASP03
 
31%
20210101_20231231
ASP04
 
26%
20210101_20231231
ASP05
 
25%
20210101_20231231
ASP06
 
23%
20210101_20231231
APO01
 
20210101_20231231
USE01
 
20210101_20231231
NM01
 
20210101_20231231
NM02
 
20210101_20231231
NM03
 
20210101_20231231
NM04
 
20210101_20231231
NM05
 
20210101_20231231
NM06
 
20210101_20231231
NM07
 
20210101_20231231

Supporting Material

Title Related SLoAs

SDM - Standardisation and Regulation support to CP1 deployment 2021, Deliverable D1.1.1 07/2021

https://www.sesardeploymentmanager.eu/publications/deployment-programme

APO01, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06, NM01, NM02, NM03, NM04, NM05, NM06, NM07, USE01

Consultation & Approval

Working Arrangement in charge
-
Outline description approved in
Latest objective review at expert level
Commitment Decision Body
-
Objective approved/endorsed in
Latest change to objective approved/endorsed in