AOP23 — Integrated runway sequence for full traffic optimization on single and multiple runway airports

The efficient use of integrated arrival and departure planning requires the development of early and dynamic planning of arrival and departure sequences into the runway of an airport. Today limitations with static patterns, lack of predictability and high manual workload need to be improved. To reduce extensive queuing in the air and on ground for reduction of airline fuel consumption/cost, there is a need of trajectory-based and early planning for improved operational efficiency.

The concept of Traffic Optimisation on single and multiple runway airports is applicable for all airport layouts that have dependencies between arrivals and departures. This includes runways operated in mixed mode as well as runway layouts with interdependencies between arrivals and departures.

The airport layout may bring constraints on the traffic flow management flexibility and then yield less coupling potential. The single runway and parallel runways in mixed mode is currently recognised to be the most constrained situation.

Optimised integration of arrival and departure traffic flows with the use of a trajectory-based Integrated Runway Sequence address a number of significant operational environments and validations are performed with a variation of industrial prototypes in advanced IBP´s.

The main goal for the Integrated RWY Sequence function is to establish an integrated arrival and departure sequence by providing accurate Target Takeoff Times (TTOTs) and Target Landing Times (TLDTs), including dynamic balancing of arrivals and departures while optimising the runway throughput.

The look ahead Time Horizon e.g. 1 hour is the time at which flights become eligible for the integrated sequence. The Stable Sequence Time Horizon is the time horizon within which no automatic swapping of flights in the sequence will occur, but landing and departure time will still be updated. The value of these time horizons is determined by the local implementation and they are not necessarily the same for arrivals and departures.

The Integrated Runway Sequence is planned before Arrival flights top of decent and linked with Airport CDM procedures for departures. Fine-tuning of Arrival and Departure target times is provided to ensure efficient runway throughput.

NOTE 1: This is an "Initial" objective to provide advance notice to stakeholders. Some aspects of the objective require further validation.

NOTE 2: The SLoAs listed in this document should be addressed to air navigation service providers as well as to airport operators. This is due to the fact that some airports operate their own ground control units for specific areas of responsibility at the airport. Airport operators providing air traffic control services qualify as ANSPs and are therefore covered by the ASP SLoAs. It is up to each implementer to check and select what is relevant to them, depending on local areas of responsibilities

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Airport Operator
Type
SESAR
Scope
Airport
Status
Initial

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area:
See list of airports in MP Level 3 Implementation Plan - Annexes
(Not yet defined)
Timescales From By Applicable to
IOC used for Analytics functioning only - not for implementation planning 01-01-2020 -
FOC used for Analytics functioning only - not for implementation planning - 31-12-2030

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
None
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
-
Operating Environments
-

Expected Performance Benefits

Safety
Safety maintained while increasing capacity
Capacity
Increased airport capacity
Operational efficiency
Both fuel efficiency as well as CO2/Flight Time Efficiency
Cost efficiency
-
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Adapt the local systems so as to enhance the coupled AMAN-DMAN
 
ASP02 Improve the synchronisation between arrivals and departures
 
ASP03 Adapt the ATC System to support integrated arrival/departure sequence functionalities
 
ASP04 Develop appropriate procedures
 
ASP05 Safety assessment
 
ASP06 Training
 
ASP07 System in use
 
APO01 Adapt the local systems so as to enhance the coupled AMAN-DMAN
 
APO02 Improve the synchronisation between arrivals and departures
 
APO03 Develop appropriate procedures
 
APO04 Safety assessment
 
APO05 Training
 
APO06 System in use
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOP23
 
20200101_20301231
ASP01
ASP02
ASP03
ASP04
ASP05
ASP06
ASP07
APO01
APO02
APO03
APO04
APO05
APO06

Supporting Material

Title Related SLoAs

Consultation & Approval

Working Arrangement in charge
-
Outline description approved in
-
Latest objective review at expert level
-
Commitment Decision Body
-
Objective approved/endorsed in
-
Latest change to objective approved/endorsed in
-