eATM Portal

AOM20 — Implement ATS Route Network (ARN) - Version 7


Implement ATS Route Network Version 7 (ARN V7) as a response to the Airspace Action Plan and the 2015 Airspace Concept and Strategy for the ECAC States.

Develop, validate and implement ARN V7 in accordance with Advanced Airspace Scheme (AAS) principles taking into account military requirements.

The objective will ensure the progressive deployment of the AAS route network and consolidate into a network approach the first FAB developments, Free Route Airspace (FRA) implementation, and Terminal Airspace System (TAS) developments.

The progressive implementation of ARN V7 will ensure the delivery of the airspace structure elements of SESAR Deployment Baseline.



-

Edition
2022
Stakeholders
Air Navigation Service Provider / Military / Airspace Users / International Organisations and Regional Bodies
Type
SESAR
Scope
ECAC
Status
Achieved

Context

Related Elements
Operational Improvement Steps

Applicability Area(s) and Timescales

Applicability Area:
All ECAC States
Timescales From By Applicable to
Initial operational capability 01-05-2011 - Applicability Area
Full operational capability - 31-10-2013 Applicability Area

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
None
Applicable ICAO Annexes and other references
ECAC Advanced Airspace Scheme Concept
The Airspace Action Plan approved at the 27th EUROCONTROL PC in November 2007
The 2015 Airspace Concept and Strategy for the ECAC States adopted by SCG/7 in February 2008
Deployment Programme 2022
-
Operating Environments
En-Route
Network

Expected Performance Benefits

Safety
Some enhancement through reduction in controller workload.
Capacity
Increased through reduction in conflict points, and specialization of routes and sectors to enhance productivity and reduce controller workload.
Operational efficiency
-
Cost efficiency
Savings in route distances in some States as well as better fuel efficiency through increased use of preferred flight profiles and improved sectorisation.
Environment
Reductions in emissions through use of more optimal routes.
Security
N/A
  Code Title From By Related Enablers
 
ASP01 Implement national airspace structure changes
  • 01-05-2011
  • 31-10-2013
 
ASP02 Ensure compatibility of en-route and terminal airspace
  • 01-05-2011
  • 31-10-2013
 
USE01 Adapt flight planning
  • 01-05-2011
  • 31-10-2013
 
INT01 Amend ICAO EUR Regional Plan FINALISED
 
AGY01 Adapt Flight Planning and ATFCM systems, processes and procedures
  • 01-05-2010
  • 31-10-2012
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOM20
 
20110501_20131031
ASP01
 
20110501_20131031
ASP02
 
20110501_20131031
USE01
 
20110501_20131031
INT01 (FINALISED)
20110501_20120331
AGY01
 
20100501_20121031

Supporting Material

Title Related SLoAs

EUROCONTROL - DMEAN Concept of Operations - Edition P1 / 09/2004

http://www.eurocontrol.int/dmean/public/standard_page/Concept_of_operations.html

AGY01

EUROCONTROL - European ATS Route Network (ARN) Version 2013-2015 06/2013

http://www.eurocontrol.int/sites/default/files/publication/files/ernip-part2-arn-v-2013-2015-07062013.pdf

ASP01, ASP02

EUROCONTROL - European Airspace Design Methodology Guidelines - General Principles and Technical Specifications for Airspace Design - Edition 1.1 / 05/2012

http://www.eurocontrol.int/articles/operations-planning

ASP02

EUROCONTROL - European Route Network Improvement Plan - Framework Document - Edition 1.1 / 05/2012

http://www.eurocontrol.int/articles/operations-planning

ASP02

EUROCONTROL - Route Availability Document (RAD) - Edition 1.1 / 05/2012

http://www.eurocontrol.int/articles/operations-planning

ASP02

ICAO - EUR Region Plan for Implementation of Amendment 1 to the 15th edition of the PANS-ATM Document 'New FPL Contents for 2012' - Edition v1.28 / 06/2012

http://www.eurocontrol.int/articles/icao-flight-planning-modifications-2012-documentation-related-links

USE01

Consultation & Approval

Working Arrangement in charge
NETOPS / RNDSG
Outline description approved in
01/2010
Latest objective review at expert level
04/2012
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
08/2011
Latest change to objective approved/endorsed in
07/2012