Abrogate coordination with the original accepting ATSU
|
Following the agreement of a set of coordination data, the controller team abrogates the...
|
Activity
|
|
Accept coordination revision
|
The controller accepts the requested revision to the coordinated flight level via ground-ground...
|
Activity
|
|
Accept release of flight
|
The controller team at the Transferring ATSU accepts the release request via the HMI.
The...
|
Activity
|
|
Acknowledge clearance resume report
|
The controller acknowledges the report from the flight crew that the aircraft has resumed the...
|
Activity
|
|
Acknowledge flight crew report
|
The controller acknowledges the flight crew report.
|
Activity
|
|
Acknowledge go-around
|
The tower controller acknowledges the reception of the go-around report.
|
Activity
|
|
Acknowledge ILS/GLS/LPV approach clearance
|
The pilot acknowledges the ILS/GLS/LPV approach clearance.
|
Activity
|
|
Acknowledge instruction
|
Flight crew confirms that the instruction is feasible and the A/C will follow it.
|
Activity
|
|
Acknowledge landing clearance
|
The pilot acknowledges the landing clearance to the tower controller.
In the case of a PinS...
|
Activity
|
|
Acknowledge pilot notification
|
The controller acknowledges the pilot notification.
|
Activity
|
|
Acknowledge resolution advisory report
|
After the flight crew has reported the RA or the aircraft has departed from its clearance, the...
|
Activity
|
|
Acknowledge RNP to ILS/GLS/LPV approach procedure request
|
The approach controller acknowledges the flight crew request for a RNP to ILS/GLS/LPV approach...
|
Activity
|
|
Activate appropriate guidance mode
|
The pilot activates the selected Runway or FATO, Approach (ILS/GLS or LPV) and VIA (RNP segment...
|
Activity
|
|
Activate ARES
|
Prior/with the mission entering the VPA in order to start with their training the TRAMON...
|
Activity
|
|
Adapt sector configurations
|
—
|
Activity
|
|
Adjust arrival WT separation according to WDS rules
|
The WT separation may be reduced or suspended according to the Weather-Dependent Separation...
|
Activity
|
|
Adjust departure WT separation according to WDS rules
|
The Wake-Turbulence separation may be reduced or suspended according to the Weather-Dependent...
|
Activity
|
|
Advise time constraint no longer achievable
|
The aircraft FMS alerts the crew to a potentially Missed RTA (e.g. the agreed CTA is considered...
|
Activity
|
|
Advise time constraint no longer required
|
Destination ATSU assesses the sequence and the constraint is no longer needed.
|
Activity
|
|
Agree collaboratively selected solution
|
—
|
Activity
|
|
Agree coordination actions
|
Except with the new collaborative control procedures where the traditional requirement to...
|
Activity
|
|
Agree entry coordination
|
Inform previous sector and tactical controller that the coordination is accepted (can be fully...
|
Activity
|
|
Agree to the runway configuration
|
Approach ATC Supervisor is aware of traffic demand, the runway and weather conditions, and for...
|
Activity
|
|
Allocate STAR to arrivals
|
ATS unit determines the flights arriving to the aerodrome that are affected by the runway...
|
Activity
|
|
Analyse Alert/Warning
|
The APOC supervisor, or the Airport tower supervisor assesses the situation and if action is...
|
Activity
|
|
Analyse Alert/warning/report and create OIM
|
—
|
Activity
|
|
Analyse and update ARES change proposal
|
A CDM negotiation starts between AMC, and WOC and AMC makes the proposal and explains it with...
|
Activity
|
|
Analyse and update Long Term Planning
|
CDM if required to support impact assessment and planning adjustements
|
Activity
|
|
Analyse crisis
|
—
|
Activity
|
|
Analyse Crisis Event request
|
[DOD 7.2 modelling] The Network Manager and/or the Flow Manager analyse the situation in order to...
|
Activity
|
|
Analyse DCB Imbalance
|
[DOD 7.2 modelling] The Local Traffic Manager and/or the Flow Manager analyse the demand versus...
|
Activity
|
|
Analyse Hotspot Sequence List
|
—
|
Activity
|
|
Analyse imbalance and/or complexity issue
|
[DOD 7.2 modelling] The Local Traffic Manager and/or the Flow Manager perform an analysis of...
|
Activity
|
|
Analyse impact of multiple AMANs information
|
—
|
Activity
|
|
Analyse latest information at local level
|
[DOD 7.2 modelling] At DCB management level, the Local Traffic Manager and/or the Flow Manager...
|
Activity
|
|
Analyse latest information at Network level
|
[DOD 7.2 modelling] At Network Management level, the Network Manager will check the latest...
|
Activity
|
|
Analyse planning data
|
—
|
Activity
|
|
Analyse the Network Demand and Resources and Capabilities
|
[DOD 7.2] The Network Management analyses the traffic demand and the resources and capabilities...
|
Activity
|
|
Analyse the updated Demand and Resources and Capabilities
|
[DOD 7.2 modelling] Taking into account modifications due to update in demand and resources and...
|
Activity
|
|
Analyse the updated Network Demand and Resources and Capabilities
|
[DOD 7.2 modelling] The Network Manager evaluates the updated potential imbalances at Network...
|
Activity
|
|
Anticipate imbalances at local level
|
[DOD 7.2 modelling] Following the analysis of the demand and resources and capabilities, the...
|
Activity
|
|
Anticipate imbalances at Network level
|
[DOD 7.2 modelling] Following the analysis of the demand and resources and capabilities, the...
|
Activity
|
|
Apply additional spacing to take into account abnormal speed differentials
|
Adequate spacing between aircraft may need to be added in order to take into account the catch-up...
|
Activity
|
|
Apply additional spacing to take into account speed differentials
|
Adequate spacing between aircraft may need to be added in order to take into account the catch-up...
|
Activity
|
|
Apply ATFCM scenarios
|
[DOD 7.2 modelling] When needed by DCB Management, the Network Management activates ATFCM...
|
Activity
|
|
Apply CAT II/III separation
|
[Baseline] In case of Low Visibility Conditions, the separation between two aircraft must be...
|
Activity
|
|
Apply Minimum Separation using RSP
|
With Required Surveillance Performance (RSP), the standard minima separation between two aircraft...
|
Activity
|
|
Apply PWS separation
|
By taking into account static aircraft characteristics of the lead and follower aircraft (such as...
|
Activity
|
|
Apply PWS separation (Step 2)
|
—
|
Activity
|
|
Apply RECAT EU separation
|
By redefining 6 wake turbulence categories ([RECAT EU]), compared to the traditional ICAO...
|
Activity
|
|
Apply reduced CAT II/III separation
|
—
|
Activity
|
|
Apply regulations
|
[DOD 7.2 modelling] On demand from DCB Management, the Network Manager activates requested...
|
Activity
|
|
Apply separation to take into account flow rate restrictions over departure routes
|
Mail sent. Waiting for an answer.
|
Activity
|
|
Apply separation to take into account sid interactions
|
Mail sent. Waiting for an answer.
|
Activity
|
|
Apply standard Minimum Pair Separation
|
[Baseline] A standard minima separation, measured in time, must be applied between two aircraft...
|
Activity
|
|
Apply standard Minimum Pair Separation in Approach
|
[Baseline] The standard minima separation to be applied between two aircraft on the final...
|
Activity
|
|
Apply standard WT separation
|
ICAO defines 4 wake turbulence categories (H, M, L, J). Depending on the category of the lead and...
|
Activity
|
|
Apply TRACT CTO proposal
|
—
|
Activity
|
|
Approve and publish UDPP proposal at A-CDM level
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will refuse or accept the proposed...
|
Activity
|
|
Approve and publish UDPP proposal at Network level
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will refuse or accept the proposed...
|
Activity
|
|
Arm approach flight control mode
|
After receiving the ILS/GLS/LPV approach clearance, the flight deck arms the ILS, LPV or GLS...
|
Activity
|
|
Assess acceptability of contract
|
Upon reception of the ADS contract request, the aircraft determines if it can fulfil the demands...
|
Activity
|
|
Assess AMAN planning
|
The controller in the upstream sector is presented with the TTL from the AMAN or, in the multiple...
|
Activity
|
|
Assess Amended IM Clearance
|
The flight crew, with the help of the IM airborne function, assesses the feasibility of the...
|
Activity
|
|
Assess and Coordinate tactical change
|
Following the request for additional airspace or if a change to the actual plan occurs update is...
|
Activity
|
|
Assess and determine resolving action when needed
|
If the distance between the three-dimensional positions of two aircraft is predicted to be...
|
Activity
|
|
Assess ATC clearance
|
The flight crew assess the impact of the clearance from a safety/flight execution perspective and...
|
Activity
|
|
Assess ATC instruction
|
The issued instruction is assessed by the flight crew, from safety and flight execution...
|
Activity
|
|
Assess coordination counter-proposal
|
The controller team assesses the counter-proposal and can either accept it or reject it.
|
Activity
|
|
Assess coordination proposal
|
The controller team assesses the coordination revision proposal and can either accept it or make...
|
Activity
|
|
Assess CTA Cancellation Instruction
|
The flight crew assess the impact of the received CTA cancel instruction.
|
Activity
|
|
Assess deviation cause/implications
|
When ATCOs detect a deviation and safety is not immediately compromised, they analyse it,...
|
Activity
|
|
Assess entry conditions and desired/planned profile through AoR/AoI
|
The planning controller looks at the characteristics of the flight and its expected trajectory...
|
Activity
|
|
Assess feasibility of CTA
|
The flight crew assess the impact of the received CTA proposal.
|
Activity
|
|
Assess IM clearance
|
The flight crew, with the help of the IM airborne function, assesses the feasibility of the IM...
|
Activity
|
|
Assess limitation or reason for air/ground trajectory contract rejection
|
If the contract was rejected (or only partially accepted), the ATSU assesses the limitation (if...
|
Activity
|
|
Assess Load
|
The TMA Manager tool assesses the predicted flow rates and complexity levels at each TMA Exit...
|
Activity
|
|
Assess magnitude of bunching in En Route sector with converging inbound streams to TMA
|
The CMAN checks if the bunching regarding the restrictions applicable (e.g. 90 seconds separation...
|
Activity
|
|
Assess need for resuming IM Operation
|
The controller assesses the needs to either resume the IM operation or stop the on-going...
|
Activity
|
|
Assess pilot request
|
ATC notify Flight 002 to standby while the request is assessed. If ATC can immediately assess...
|
Activity
|
|
Assess pilot request for network impact
|
Local NM assess if the request can be facilitated within the agreed goals of the network plan and...
|
Activity
|
|
Assess plan to facilitate AMAN advisory
|
The planning controller in ATS unit B is made aware of an AMAN advisory for Flight 003 through...
|
Activity
|
|
Assess planned profile constraints or agreed coordinations
|
Assess whether there are any planned constraints or agreed coordination actions to consider in...
|
Activity
|
|
Assess planned/desired profile for problems within AoR/AoI
|
Determine whether there are any problems between the aircraft’s trajectory profile and other...
|
Activity
|
|
Assess Predictability and uncertainty of Demand Forecast
|
[DOD 7.2] Based upon any assumptions made within the process of compiling any forecast demand...
|
Activity
|
|
Assess release of flight request
|
The Transferring ATSU system retrieves the release request from the updated Flight Object and...
|
Activity
|
|
Assess request for flight on frequency
|
—
|
Activity
|
|
Assess restarting IM execution instruction
|
The flight crew reassesses the feasibility of the resume instruction and accepts or rejects it.
|
Activity
|
|
Assess suitability of the WT separation applied
|
The suitability of the Wake-Turbulence separation determined by applying the previous rules...
|
Activity
|
|
Assess tactical feasibility against traffic situation
|
The controller in the upstream sector is presented with the TTL from the AMAN or, in the multiple...
|
Activity
|
|
Assess taxi route change request
|
In some cases, the Flight Crew may request a change of Taxi-in Route. It will be examined by the...
|
Activity
|
|
Assess the tactical feasibility of CTA against traffic
|
The current controlling ATS unit retrieves the CTA Proposal from the Flight Object and notifies...
|
Activity
|
|
Assess TRACT resolution applicability
|
—
|
Activity
|
|
Assess traffic complexity
|
This activity is run periodically to assess the complexity of the current and future traffic...
|
Activity
|
|
Assess Traffic Situation
|
The Controlling ATSU, due to the evolving traffic situation, may elect to cancel the CTA.
|
Activity
|
|
Assess trajectory profile through the AoR for tactical controller suitability
|
The planning controller looks along the flight path in his/her AoR to assess whether the...
|
Activity
|
|
Assume communications with flight
|
The executive controller in the Accepting ATSU enters the assumption of communication for the...
|
Activity
|
|
Assume control of flight
|
The aircraft passes the coordination point. The Accepting ATSU assumes control of the flight and...
|
Activity
|
|
Assume control of the flight
|
A two-way R/T has been established with the flight crew and the runway controller may issue ATC...
|
Activity
|
|
ATM Environment and Constraints Service Provision
|
This functional activity involves the Network Management providing to the FOC (upon FOC's...
|
Activity
|
|
ATM Environment and Constraints Service Provision, Traffic Demand Computation, DCB
|
Description: This activity involves Network Management providing of information on ATM...
|
Activity
|
|
Automatically update status of ARES
|
—
|
Activity
|
|
Build the list of ATSUs to be notified analysing their AoR with EFPLN 4DT
|
NM builds the list of ATSUs to be notified, analysing their area of interest intersection with...
|
Activity
|
|
Calculate a departure sequence
|
The DMAN allocates the departure sequence. The estimated taxi-times (EXOP) provided by surface...
|
Activity
|
|
Calculate an accurate pre-departure sequence
|
DMAN derives TSAT from TTOT.
[06.08.04 D17]
|
Activity
|
|
Calculate an arrival sequence
|
The AMAN, as master, will be in charge of calculating the arrival sequence (considering the...
|
Activity
|
|
Calculate Baseline Delay
|
—
|
Activity
|
|
Calculate UDPP
|
Combine and Apply SFP and FDA to recalculate sequence
Calculate Prioritised Delay UIBT,...
|
Activity
|
|
Call Approach Controller
|
[Baseline process] Initiate a communication with the new controller in charge of the aircraft.
|
Activity
|
|
Cancel ADS-C contract
|
—
|
Activity
|
|
Cancel ARES
|
The user of the airspace or the responsible supervisor cancels the ARES
|
Activity
|
|
Cancel point and update flight object
|
When no longer required, the ATSU controller cancels the point function via the HMI, and removes...
|
Activity
|
|
Capture Airport ops environmental data
|
[DOD 7.2] The Airport Ops Support captures data relevant to the airport operational environment...
|
Activity
|
|
Capture laterally the final approach path
|
The pilot captures the ILS/GLS/LPV final approach trajectory laterally not later than the FAP/FAF...
|
Activity
|
|
Capture local ops environmental data
|
[DOD 7.2] The Local Capacity Management captures data relevant to the local and sub-regional...
|
Activity
|
|
Capture LTM Airspace change request
|
—
|
Activity
|
|
Capture Mission change request
|
—
|
Activity
|
|
Capture Network ops environmental data
|
[DOD 7.2] The Network Management captures data relevant to the wider regional (European and out...
|
Activity
|
|
Capture Network, Airport and ANSP Resources and Capabilities
|
[DOD 7.2] The Regional/Sub-regional Network Management captures the capacity resource and...
|
Activity
|
|
Capture new Airspace Configuration
|
—
|
Activity
|
|
Change frequency and contact tower controller
|
The pilot changes the frequency and contacts the tower controller.
In the case of a PinS...
|
Activity
|
|
Change Mission Trajectory
|
—
|
Activity
|
|
Change Reference Trajectory
|
—
|
Activity
|
|
Change RTF frequency
|
The flight crew acknowledge the instruction to transfer communications and respond with a WILCO.
|
Activity
|
|
Change runway configuration for ADES
|
The Tower notifies the appropriate upstream ATS units of the configuration of the runway(s) at...
|
Activity
|
|
Check and agree route proposal to resolve route discrepancy
|
—
|
Activity
|
|
Check and validate iSBT/iSMT
|
[DOD 7.2] A planned trajectory will be checked within the Network Management environment,...
|
Activity
|
|
Check AU Performance
|
—
|
Activity
|
|
Check conformance to planned constraints
|
Both executive and planning controllers, assisted by a conformance monitoring tool, monitor the...
|
Activity
|
|
Check coordination data against LoA conditions
|
The planning controller manually checks the coordination offer against the LoA and current...
|
Activity
|
|
Check current flight data
|
The flight crew checks flight data and on-board systems availability. In case of erroneous manual...
|
Activity
|
|
Check revision against LoA conditions
|
The ATSU planning controller manually checks the revised coordination againts the LOA and current...
|
Activity
|
|
Check that request is compatible with workload
|
C-ATSU controller receives the request from D-ATSU 3 to re-clear the flight in accordance with...
|
Activity
|
|
Check that the runway is clear
|
By visual reference and using the ATM system, the Tower Runway Controller verifies that the...
|
Activity
|
|
Check the Network effect of UDPP proposal
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will assess whether the rules are...
|
Activity
|
|
Check UDPP proposal in terms of A-CDM rules for departure
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will assess whether the rules are...
|
Activity
|
|
Check UDPP proposal in terms of rules for the exchange of ATFM slots
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will assess whether the rules are...
|
Activity
|
|
Choose the most restrictive separation
|
Considering the different separations rules that may be applied (the one due to wake turbulence,...
|
Activity
|
|
Clear aircraft for approach
|
[Baseline] Clear the aircraft for an approach.
|
Activity
|
|
Clear aircraft for ILS/GLS/LPV approach
|
During the intermediate segment, the controller clears the aircraft for the ILS/GLS/LPV approach.
|
Activity
|
|
Clear aircraft for RNP to ILS/GLS/LPV approach
|
The approach controller clears the aircraft to fly the RNP to ILS/GLS/LPV approach procedure....
|
Activity
|
|
Clear aircraft to requested level
|
The executive controller clears the aircraft to the new cruise level. The pilot acknowledges the...
|
Activity
|
|
Collaboratively coordinate local DDCB measure with partners. Assess DDCB measure impact
|
[DOD 7.2 modelling] The Local Traffic Manager and/or the Flow Manager coordinate through a CDM...
|
Activity
|
|
Collaboratively refine Airspace Allocation
|
—
|
Activity
|
|
Collaboratively validate DCB solutions
|
[DOD 7.2 modelling] The CDM process allows the validation of the DCB/dDCB solutions by all the...
|
Activity
|
|
Collaboratively validate DDCB solutions
|
[DOD 7.2 modelling] The CDM process allows the validation of the DCB/dDCB solutions by all the...
|
Activity
|
|
Collect and analyse Airspace demand data
|
The AMC receives the civil and military request and detects interfering request. In case of...
|
Activity
|
|
Collect and validate draft AUP/UUP
|
—
|
Activity
|
|
Communicate CTA
|
The controller communicates the CTA via voice or via CPDLC using the HMI to uplink the...
|
Activity
|
|
Communicate CTA Cancellation
|
The Executive Controller issues an explicit instruction to the flight crew to cancel CTA.
|
Activity
|
|
Compare actual vs planned operations
|
—
|
Activity
|
|
Compare deviation vs alert/warning THR KPI
|
—
|
Activity
|
|
Complete the OIM
|
—
|
Activity
|
|
Confirm aircraft type
|
See the description of Contact Approach Controller.
|
Activity
|
|
Confirm correlation and highlight of flight
|
The ATSU checks that it can unambiguously correlate the retrieved flight information to a...
|
Activity
|
|
Consolidate DCB repository
|
[DOD 7.2 modelling] Following the CDM process, the Network Manager consolidates the DCB solutions...
|
Activity
|
|
Consolidate DDCB repository
|
[DOD 7.2 modelling] Following the CDM process, the Local Traffic Manager and/or the Flow Manager...
|
Activity
|
|
Consolidate the Airport Resource Allocation Plan
|
—
|
Activity
|
|
Consolidate the airport resource availability plan
|
—
|
Activity
|
|
Consolidate the airport schedule
|
—
|
Activity
|
|
Contact ATS unit
|
The aircraft establishes communication with the Accepting ATSU.
The flight crew report their...
|
Activity
|
|
Contact Tower Runway Controller
|
The Flight Crew contacts the next controller in charge of the aircraft.
|
Activity
|
|
Contact Tower Runway Controller at departure
|
The Flight Crew contacts the next controller in charge of the aircraft.
|
Activity
|
|
Coordinate and implement crisis measure
|
—
|
Activity
|
|
Coordinate ATFCM measures at regional/sub-regional level
|
[DOD 7.2 modelling] A measure at sub-regional or regional level is required by DCB Management....
|
Activity
|
|
Coordinate DDCB solutions with partners
|
[DOD 7.2 modelling] The prepared DCB/dDCB solutions are collaboratively coordinated with...
|
Activity
|
|
Coordinate de-complexing solution
|
Coordination may involve different actors depending on the de-complexing solution including...
|
Activity
|
|
Coordinate initial arrival sequence
|
The En Route controller checks the initial arrival sequence provided by the approach controller....
|
Activity
|
|
Coordinate STAM
|
—
|
Activity
|
|
Coordinate STAM with LTMs, AUs, TWRs and NM if needed
|
after having selected the appropriate DDCB measure to solve the problem, the INAP function...
|
Activity
|
|
Coordinate with D-ATSU3
|
—
|
Activity
|
|
Correct ground data
|
In case of clearance input mistake on the ground: the controller corrects his/her inputs, in...
|
Activity
|
|
Create ARES according to the VPA principle, associated route network and management rules of the ARES
|
HLAPB is responsible for analysing and possibly modifying the design of ARES according VPA...
|
Activity
|
|
Create AUP/UUP and publish in the NOP
|
Description: This activity involves the Network Management (CADF) receiving the Draft AUP/UUPs...
|
Activity
|
|
Create Early Intent Information
|
Description: This activity produces the Early Intent for the mission activity. In SESAR Step 1...
|
Activity
|
|
Create expected Operational Airport Context
|
—
|
Activity
|
|
Create Preliminary eFPL
|
—
|
Activity
|
|
Create/update iSMT improved OAT FPL referencing ARES VPA allocated
|
Description: This activity involves the WOC creating or updating the OAT flight plan (also...
|
Activity
|
|
DCB/dynamic DCB
|
This activity involves traffic demand and capacity balancing, by identifying demand/capacity...
|
Activity
|
|
De-activate ARES
|
As soon as all ARES user finally left the area (with the end of the booked usage time latest) the...
|
Activity
|
|
Decide and agree to the application of TBS
|
Approach Supervisor is aware of the wind conditions, and for deciding and agreeing to the...
|
Activity
|
|
Decide and agree to the application of WDS
|
Approach Supervisor is aware of the wind conditions, and for deciding and agreeing to the...
|
Activity
|
|
Decide for landing or missed approach
|
If the required visual references are not established at the DH, the pilot decides to start the...
|
Activity
|
|
Decide on the application of TBS to reduce separation
|
Approach Supervisor is aware of the wind conditions, and for deciding and agreeing to the...
|
Activity
|
|
Decide on the application of WDS
|
Approach Supervisor is aware of the wind conditions, and for deciding and agreeing to the...
|
Activity
|
|
Decide whether to terminate, suspend or amend the IM Operation
|
The controller decides if it is preferable to suspend the IM operation, to have a chance to...
|
Activity
|
|
Define Airport Future enhancement plan
|
—
|
Activity
|
|
Define an ARES as a combination of airspace modules in accordance with mission needs
|
the military identifies and identifies a need for a restricted or segregated airspace to protect...
|
Activity
|
|
Define an ARES in accordance with mission needs
|
the users / pilots refine the planning, define the ARES for each mission and start the booking...
|
Activity
|
|
Define and publish new Airspace Configuration
|
—
|
Activity
|
|
Define and update Airport resources and capabilities
|
[DOD 7.2] The Airport Ops support analyses the operational environment data with respect to its...
|
Activity
|
|
Define and update local resources and capabilities
|
[DOD 7.2] The Local Capacity Management analyses the operational environment data with respect to...
|
Activity
|
|
Define ARES needs
|
Description: This activity involves the WOC defining the ARES needs for a mission trajectory, and...
|
Activity
|
|
Define Standard Capacity Values
|
—
|
Activity
|
|
Delegate to LTM
|
—
|
Activity
|
|
Deselect TPO
|
The pilot deselects the TPO automatically in case of closed-loop instruction, manually otherwise.
|
Activity
|
|
Designate target aircraft
|
The flight crew designates the Target Aircraft and enters the Target Aircraft Intended Flight...
|
Activity
|
|
Detect and resolve conflicting ARES requests
|
The ASM identify a conflict between 2 requests. It highlights it to be taken into account by the...
|
Activity
|
|
Detect DCB Imbalance
|
The Local Traffic Manager and/or the Flow Manager monitor the balance between demand and capacity...
|
Activity
|
|
Detect Demand & Capacity imbalance
|
—
|
Activity
|
|
Detect demand and capacity imbalance vs KPI
|
—
|
Activity
|
|
Detect runway vacation
|
Vacate the runway and report that the runway is vacated if requested by the tower runway...
|
Activity
|
|
Detect touchdown
|
The Ground System detects touchdown, records the information and makes this information available...
|
Activity
|
|
Determine Airborne Intended Exit
|
A preferred runway exit is calculated by the EBS. An alternate runway exit may be proposed by the...
|
Activity
|
|
Determine Airport Demand
|
—
|
Activity
|
|
Determine Airport Future Demand
|
—
|
Activity
|
|
Determine Airport Resources and Capabilities
|
—
|
Activity
|
|
Determine CTA feasibility
|
The destination ATSU retrieves the ETA min/max information (directly from aircraft or...
|
Activity
|
|
Determine de-complexing solutions
|
When the traffic situation involves an unacceptable level of complexity, it is necessary to...
|
Activity
|
|
Determine default runway exit
|
Baseline process to determine the default runway exit when the aircraft is not equipped with EBS.
|
Activity
|
|
Determine estimated taxi time
|
The calculated planned taxi-out route is used by the ATC system to calculate an estimated taxi...
|
Activity
|
|
Determine estimated taxi time and refine EIBT
|
The planned taxi-in route is used by the ATC system to calculate an accurate taxi time. This taxi...
|
Activity
|
|
Determine planning problems at offered entry conditions
|
Looking along the flight path within his/her AoR, the planning controller assesses the entry...
|
Activity
|
|
Determine revision to ground route and propose via WIFO
|
Depending upon the impact (e.g. their sector only, limited to the AOR of the ATSU, or impact...
|
Activity
|
|
Determine safe potential exit conditions
|
The planning controller looks at the characteristics of the flight and its expected trajectory...
|
Activity
|
|
Determine taxi-in route
|
The Route Generation Algorithm ([RGA]) is informed by the ATC system that the assigned landing...
|
Activity
|
|
Determine taxi-out route
|
The Route Generation Algorithm ([RGA]) is informed by the ATC system that the assigned departure...
|
Activity
|
|
Determine the runway configuration
|
Tower Supervisor is responsible for ensuring runway conditions, and planned and forecast changes...
|
Activity
|
|
Determine the sequence pattern and AFI size
|
It is decided at local level if it is the approach supervisor or the tower supervisor who should...
|
Activity
|
|
Determine TRACT CTO proposal
|
—
|
Activity
|
|
Develop ad-hoc candidate solution
|
—
|
Activity
|
|
Disable FRT functionality from the FMS
|
The FRT functionality is deactivated on the concerned waypoint. This may happen in case of strong...
|
Activity
|
|
Disable RF functionality from the FMS
|
The RF functionality is deactivated on the concerned waypoint. This may happen in case of strong...
|
Activity
|
|
Disable the RWSL system
|
In case of heavy rain / snow, the tower supervisor shall have the possibility to switch off...
|
Activity
|
|
Disengage RTA Function
|
The flight crew disengages the RTA function in the FMS.
Note: as a result of cancelling the CTA...
|
Activity
|
|
Display abrogation to controller
|
—
|
Activity
|
|
Display confirmation to controller
|
The upstream ATSU retrieves the indication, and displays the confirmation on the controller team...
|
Activity
|
|
Display coordination counter-proposal response to controller
|
—
|
Activity
|
|
Display coordination data to controller
|
The ATSU retrieves the coordination data from the Flight Object and displays it on the controller...
|
Activity
|
|
Display coordination offer to controller team
|
The Accepting ATSU system retrieves the WIFO and presents the proposed coordination and planning...
|
Activity
|
|
Display coordination response to controller
|
The ATSU controller team is made aware that the coordination revision is either accepted or...
|
Activity
|
|
Display coordination to controller
|
The controller in the ATSU is made aware that coordination has been made.
NOTE: At this point,...
|
Activity
|
|
Display CTA Status on HMI
|
All controllers handling the flight are made aware of the CTA through the HMI. Controllers need...
|
Activity
|
|
Display point to controller
|
The ATSU retrieves the point indication from the Flight object.
|
Activity
|
|
Display rejection of release to controller
|
The Accepting ATSU system retrieves the rejection from the updated Flight Object, and presents it...
|
Activity
|
|
Display release to controller
|
The Accepting ATSU system retrieves the rejection from the updated Flight Object, and presents it...
|
Activity
|
|
Display revision proposal to controller team
|
The ATSU system retrieves the WIFO and presents the proposed coordination revision and planning...
|
Activity
|
|
Display Traffic on the Aircraft Moving Map
|
If aircraft equipped (optional), [ATSA-SURF] traffic display of aircraft on the airport moving...
|
Activity
|
|
Disseminate updated Flight Data
|
—
|
Activity
|
|
Distribute accepted FPL
|
—
|
Activity
|
|
Distribute eFPL
|
—
|
Activity
|
|
Distribute iRBT to identified ATSUs
|
NM distributes the iRBT information to each of the identified ATSUs.
|
Activity
|
|
Downlink EPP
|
An ADS-C-EPP contract is established with the controlling sector. The aircraft downlinks the...
|
Activity
|
|
Downlink Reliable ETA Min/Max
|
The aircraft downlinks the reliable ETA min/max.
|
Activity
|
|
Downlink resolution advisory
|
In the event of an RA, it is automatically downlinked to the ground for controllers to build the...
|
Activity
|
|
Engage RTA function
|
Flight Crew loads the RTA in to the FMS and adjusts the flight’s trajectory according to the CTA...
|
Activity
|
|
Enrich and publish demand forecast with incoming iSMT data
|
Description: This activity involves Network Management re-computing traffic demand over traffic...
|
Activity
|
|
Enrich Demand Forecast with incoming FPL
|
Improve the accuracy of demand forecast with incoming FPL information.
Linked to process...
|
Activity
|
|
Enrich Demand Forecast with incoming iSBT/iSMT
|
[DOD 7.2] An initial demand forecast is added to and progressively replaced by real business and...
|
Activity
|
|
Enter into the Runway Zone
|
[AO-0105] There are different procedures at different airports when it comes to enter and drive...
|
Activity
|
|
Establish necessary separation
|
Determine what actions need to be taken to maintain necessary separation.
|
Activity
|
|
Establish Performance Indicators and associated Alert/Warning Thresholds
|
—
|
Activity
|
|
Establish pre-seasonal Capacity declaration
|
—
|
Activity
|
|
Establish preferred airport operational configurations
|
—
|
Activity
|
|
Execute ATC clearance
|
The airborne trajectory in the FMS active flight plan is updated with the clearance, which may...
|
Activity
|
|
Execute ATC instruction
|
The pilot applies the instructions provided by ATC (such as radar vectoring instructions, speed...
|
Activity
|
|
Execute ATC instructions or comply with target time at IMP
|
The flight crew consults the FMS to determine whether any adjustment to the flight trajectory is...
|
Activity
|
|
Execute Automated Braking during roll-out
|
On roll-out the aircraft's automatic braking system manages the deceleration to achieve the...
|
Activity
|
|
Execute Go-Around
|
The pilot executes and follows the missed approach as defined in the approach chart.
For the...
|
Activity
|
|
Execute ground movement
|
The Tow vehicle driver contacts the Tower Ground Controller by R/T and requests a clearance to...
|
Activity
|
|
Execute IM clearance
|
The flight crew monitors the progression of the IM Operation to achieve and/or maintain the...
|
Activity
|
|
Execute lateral separation instruction
|
The pilot applies the lateral separation instruction provided by the ATC.
|
Activity
|
|
Execute Line-Up
|
—
|
Activity
|
|
Execute RNP clearance and report established
|
Flight Crew performs actions to execute transition/approach clearance and report ‘RNP...
|
Activity
|
|
Execute runway crossing
|
The vehicle driver requests a runway crossing via R/T.
The vehicle driver receives the clearance...
|
Activity
|
|
Execute speed instruction
|
The pilot applies the speed instruction provided by ATC.
|
Activity
|
|
Execute start-up and push-back
|
The Flight Crew contacts the Tower Ground Control via R/T and prepares for push back. The Flight...
|
Activity
|
|
Execute Take-Off
|
—
|
Activity
|
|
Execute taxi-in
|
Manoeuvre the aircraft from the runway exit point to the stand following the taxi in guidance,...
|
Activity
|
|
Execute taxi-out
|
When the start-up is completed, the Flight Crew request taxi instructions by R/T or data link....
|
Activity
|
|
Execute vehicle route
|
Baseline process to follow a route.
|
Activity
|
|
Execute vertical separation instruction
|
The pilot applies the vertical separation instruction provided by the ATC.
|
Activity
|
|
Extended Flight Plan Creation, Updating & Publishing
|
[7.6.2 Anna Cagidemetrio] Description: This activity consists of creating, optimising and...
|
Activity
|
|
Extended Flight Plan Validation & Re-validation
|
This activity involves first validating an Extended Flight Plan or update upon request of the...
|
Activity
|
|
Extract Flight Performance Data
|
—
|
Activity
|
|
Facilitate push-back execution
|
Baseline process to execute the push-back operation.
|
Activity
|
|
File eFPL
|
—
|
Activity
|
|
Finalise Solution Message
|
—
|
Activity
|
|
Finalize coordination with another ATSU
|
When the flight reaches a predetermined time/distance (as set by LOA) from the common ATSU...
|
Activity
|
|
Flight briefing
|
This activity involves the flight crew being briefed for al available flight information as soon...
|
Activity
|
|
Flight Information Distribution
|
This activity involves distributing Extended and Reference Flight Plan information to all ATS...
|
Activity
|
|
Flight Information Reception & Maintainance
|
This activity involves receiving flight information (like Extended Flight Plans and updates,...
|
Activity
|
|
Flight Intention Creation & Updating
|
This activity involves creating and updating flight intentions. Starting from 6 months before the...
|
Activity
|
|
Flight Intention Reception & Processing
|
This activity involves receiving and processing flight intentions from the AU's FOC. Flight...
|
Activity
|
|
Fly according to IFR clearance
|
After IDF (PinS departure) point, the rotorcraft will fly the next departure segment and the...
|
Activity
|
|
Fly agreed trajectory with CTA
|
The flight crew enters a RTA and the FMS controls the aircraft to the time constraint, until the...
|
Activity
|
|
Fly aircraft on approach route
|
The pilot conforms to the planned route or to the vectoring instructions provided by ATC during...
|
Activity
|
|
Fly aircraft on initial approach route
|
The pilot conforms to the planned route (initial approach segments as published, including RF...
|
Activity
|
|
Fly aircraft on the final approach route
|
Maintain the aircraft on the glide and descend to the runway.
|
Activity
|
|
Fly and Monitor adherence to RNP route
|
During the transition, the pilot monitors the adherence of the aircraft to the RNP route while...
|
Activity
|
|
Fly CCO procedure
|
The pilot flies the aircraft according to the CCO operation procedure.
|
Activity
|
|
Fly CDO procedure
|
The pilot flies the aircraft according to CDO procedure, which can start at the entry point of...
|
Activity
|
|
Fly on FRT track
|
Aircraft flight path will be determined by the specific en route waypoint (which will be...
|
Activity
|
|
Fly on the initial departure path
|
The pilot conforms to the planned route or to the vectoring instructions provided by ATC during...
|
Activity
|
|
Fly on TPO route
|
The aircraft flies in an automatic mode on a parallel ghost route.
|
Activity
|
|
Fly RF procedure
|
Aircraft flight path will be determined by the specific TMA procedure (which will be published as...
|
Activity
|
|
Forecast Traffic Demand based on historical data
|
[DOD 7.2] Utilising old flight data from a past period with similar characteristics to that being...
|
Activity
|
|
Gain situation awareness on the occurring conflict
|
Downlinked RA is displayed on CWP and controllers are made aware of the situation. Controllers...
|
Activity
|
|
Get Landing Data
|
At a specified time before TOD (10-15 minutes) the Flight Crew initiate (manually) the upload of...
|
Activity
|
|
Give line-up instruction
|
The Tower Runway Controller checks that the departing aircraft can comply with its TTOT [TS-0202]...
|
Activity
|
|
GUFI provision
|
Description: This activity involves providing a GUFI (Globally Unique Flight Identification) for...
|
Activity
|
|
Highlight pending TRACT conflict to controllers
|
—
|
Activity
|
|
Highlight solved TRACT conflict to controllers
|
—
|
Activity
|
|
Hotspot awareness
|
—
|
Activity
|
|
Identify a need of exchange of ATFM slots
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: When deemed convenient by an Airspace User, it is...
|
Activity
|
|
Identify a need of exchange of departure times
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: When deemed convenient by an Airspace User, it is...
|
Activity
|
|
Identify a need of regulation and send ATFM slots
|
[07.02-D28-Step1 Release 4 DOD] §2.2.7: When demand for air traffic services is expected to...
|
Activity
|
|
Identify aircraft to apply separation techniques on
|
As part of the current operations, the controller identifies the aircraft that will have to be...
|
Activity
|
|
Identify and Publish declared hotspot
|
[7.2 Etienne de Muelenaere] From the activity « Analyse imbalance » an information element must...
|
Activity
|
|
Identify arriving aircraft for the departure runway
|
An appropriate actor (e.g. Sequence Manager, Group Supervisor) supported by Arrival Management...
|
Activity
|
|
Identify crisis event at Crisis Cell level
|
—
|
Activity
|
|
Identify crisis event at Network level
|
—
|
Activity
|
|
Identify discrepancies that affect AoR and highlight to ATCO
|
If there is a 2D route discrepancy in an ATSU’s AoR, an indication is provided on the HMI to warn...
|
Activity
|
|
Identify discrepancies that start in AoR
|
The D-ATSU 3 controller is warned of the route discrepancy and uses the HMI to assess its...
|
Activity
|
|
Identify Future Airport Demand and Capacity Imbalance
|
—
|
Activity
|
|
Identify most efficient solutions
|
—
|
Activity
|
|
Implement agreed solution
|
—
|
Activity
|
|
Implement and fine-tune DDCB measure
|
—
|
Activity
|
|
Implement any other STAM
|
—
|
Activity
|
|
Implement crisis measure at local level
|
—
|
Activity
|
|
Implement DDCB measure
|
[DOD 7.2 modelling] The Local Traffic Manager and/or the Flow Manager implement and promulgate...
|
Activity
|
|
Implement de-complexing dynamic re-sectorisation
|
At the appointed time the new Sector Configuration is implemented to re-distribute traffic...
|
Activity
|
|
Implement selected solution
|
—
|
Activity
|
|
Implement the select airport DCB solution
|
1. DCB will use the capacity distribution (and possibly altered demand location) of this solution...
|
Activity
|
|
Implement trajectory management solutions
|
This includes the management of individual trajectories (re-routeing, change of FL, allocation of...
|
Activity
|
|
Implement/Update/Cancel STAM
|
—
|
Activity
|
|
Indicate in FO that EPP is 'not ok' for affected AoRs, with inconsistency start and end points
|
The C-ATSU system updates the Flight Object with the results of the consistency check (in this...
|
Activity
|
|
Indicate in FO that EPP is 'ok' for all AoRs
|
The C-ATSU system updates the Flight Object with the results of the consistency check (in this...
|
Activity
|
|
Inform ATC of the go-around
|
The pilot informs the controller of the go-around.
|
Activity
|
|
Inform of runway wind conditions
|
The Tower Runway ATCO informs the Flight Crew of the runway surface wind conditions including...
|
Activity
|
|
Inform the controller of non A-RNP capability
|
In the case of failure of A-RNP capability, the flight crew informs the controller of loss of...
|
Activity
|
|
Initiate a Solution Message
|
—
|
Activity
|
|
Input airspace status change
|
The ATC Flight Data Operator in ATS Unit B enters the airspace status change to the ATC system.
|
Activity
|
|
Input filed speed change
|
The planning controller in the upstream ATSU enters the new speed via the HMI.
The upstream ATSU...
|
Activity
|
|
Input New Priorities
|
—
|
Activity
|
|
Input P-RNAV procedure in the FMS and compute optimal vertical profile
|
The pilot inputs the P-RNAV procedure in the FMS. Closed loop procedures supported by P-RNAV...
|
Activity
|
|
Instantiate AOP
|
—
|
Activity
|
|
Instruct a crisis measure
|
—
|
Activity
|
|
Instruct a procedure associated with a 'not closer than' spacing instruction
|
The controller sends an instruction (CDO, CTA, etc.) associated (if necessarty) with a 'not...
|
Activity
|
|
Instruct deviating aircraft to return to its course
|
In the event that aircraft are observed (or predicted) to deviate towards the NTZ, instructions...
|
Activity
|
|
Instruct flight to contact next unit
|
The executive controller in the Transferring ATSU uses a CPDLC message (or alternatively a verbal...
|
Activity
|
|
Instruct threatened aircraft to perform a break-out manoeuvre
|
In the event that aircraft are observed (or predicted) to blunder/infringe into the NTZ,...
|
Activity
|
|
Integrate New Hotspot Solution List
|
—
|
Activity
|
|
Integrated Airspace Organisation and Management(AOM) & Airport Operations (AO) & Demand Capacity Balancing (DCB) (Trajectory Network Impact Assessment)
|
Description: Integration of all Airspace Organisation and Management (AOM), Airport Operations...
|
Activity
|
|
Intercept final approach path and start final approach
|
The pilot intercepts the final approach path (ILS/GLS/LPV) at or before FAP/FAF, possibly through...
|
Activity
|
|
Issue clearances
|
The agreed conditions are implemented by issuing one or more clearances.
|
Activity
|
|
Issue Demand/Capacity imbalances' alerts
|
—
|
Activity
|
|
Issue Go-Direct Instruction
|
The executive controller in ATS unit issues a go-direct instruction to a flight.
|
Activity
|
|
Issue resolving action instruction
|
In case a resolving action is needed, the flight will be provided with the determined...
|
Activity
|
|
Line-up and Hold
|
Baseline process for lining-up and hold.
|
Activity
|
|
Maintain AOP
|
—
|
Activity
|
|
Maintain separation in final approach
|
The Tower Runway ATCO checks the spacing set up from when both aircraft are established on the...
|
Activity
|
|
Maintain two-ways communication with the approach controller during the transfer to tower controller
|
It is important that handover procedures between Final Approach Controller and Aerodrome/Tower...
|
Activity
|
|
Make coordination offer to downstream sector
|
Having identified appropriate exit conditions, coordination offer is made to next planning AoR...
|
Activity
|
|
Make EPP available to ATCOs and tools
|
The ATSU system retrieves the EPP data, and check status, from the FO.
The ATSU tools and ATCOs...
|
Activity
|
|
Manage Advisory/Caution alert for pilots
|
continue if it is assessed that there is still time to see how the situation evolves (The crew...
|
Activity
|
|
Manage Alert for Conflicting Clearance
|
An alert message shall be automatically triggered when [some CATC] are detected by the ATC...
|
Activity
|
|
Manage Alert for HIGH SPEED
|
[The alert is triggered] when a high speed on a taxiway is detected and where it could endanger...
|
Activity
|
|
Manage alert for LANDING ON WRONG RUNWAY
|
An arriving aircraft is detected to be aligned to a runway that differs to the assigned runway....
|
Activity
|
|
Manage Alert for LINING UP ON WRONG RUNWAY
|
A departing aircraft is detected lining up on a runway that differs to the assigned runway. When...
|
Activity
|
|
Manage Alert for NO CONTACT
|
[An alert is triggered] when the flight is transferred and the aircraft fails to contact the...
|
Activity
|
|
Manage alert for NO LANDING CLEARANCE
|
Aircraft is detected at a certain distance/time (e.g. 0.5 miles or 15 seconds) from the runway....
|
Activity
|
|
Manage Alert for NO PUSHBACK APPROVAL
|
[The alert is triggered] when the aircraft is moving from its stand. [The alert is cancelled]...
|
Activity
|
|
Manage Alert for NO TAKEOFF CLEARANCE
|
Aircraft is supposed to line up and wait but is detected moving outside of a specified area on...
|
Activity
|
|
Manage Alert for NO TAXI APPROVAL
|
[The alert is triggered]
1. When the aircraft is starting to taxi after its push-back or...
|
Activity
|
|
Manage Alert for NO TRANSFER
|
According to local implementation, the triggering condition could be:
· The position of the...
|
Activity
|
|
Manage Alert for RED STOP BAR CROSSED
|
A mobile is detected crossing a red stop bar, which can be positioned at an intermediate holding...
|
Activity
|
|
Manage Alert for ROUTE DEVIATION
|
[The alert is triggered] when the Mobile is detected deviating from the cleared taxi route on the...
|
Activity
|
|
Manage Alert for RUNWAY CLOSED
|
[The alert is triggered] when a selected runway is declared as closed within the system and a...
|
Activity
|
|
Manage Alert for RUNWAY/TAXI TYPE
|
[The alert is triggered] when the cross check to see if the runway or taxi route is suitable for...
|
Activity
|
|
Manage Alert for RWY INCURSION
|
[The alert is triggered when a] mobile [is] detected within the RPA without a clearance (e.g....
|
Activity
|
|
Manage Alert for STATIONARY
|
[The alert is triggered when]
1. The A-SMGCS detects if a mobile is given an instruction on the...
|
Activity
|
|
Manage Alert for TAXIWAY CLOSED
|
[The alert is triggered] when a selected taxiway, or segment of the taxiway, is declared as...
|
Activity
|
|
Manage Alert for Vehicle Drivers
|
When a user receives an alert he shall apply the adequate procedure according to the alert...
|
Activity
|
|
Manage CM coordination receipt
|
Network management receives the request for coordination, assesses the ACC’s decision and...
|
Activity
|
|
Manage CM coordination requests
|
Coordination requests are sent to the relevant actors, including if necessary the network manager.
|
Activity
|
|
Manage Critical Event
|
[DOD 7.2 modelling] The Local Traffic Manager and/or the Flow Manager identify that the situation...
|
Activity
|
|
Manage mid-air collision alert
|
Appropriate characteristics of each intruder are assessed to determine whether or not it is a...
|
Activity
|
|
Manage RWSL issues
|
ATC should have a procedure describing how they should react for individual lights that are...
|
Activity
|
|
Manage TBS alert
|
The system shall provide support for the automatic monitoring and alerting of deviations from the...
|
Activity
|
|
Manage the AOP
|
—
|
Activity
|
|
Manage Trajectory Information by ATS
|
This corresponds to the management of Trajectory information/data (e.g. EPP data, ADS-B data,...
|
Activity
|
|
Manage Warning alert for pilots
|
Require immediate flight crew attention and immediate flight crew response [09.14 D36]
|
Activity
|
|
Measure Wake Turbulence
|
To increase the awareness about wake turbulence encounter risk in real time, the wake turbulence...
|
Activity
|
|
Measure Wake Turbulence on board
|
To increase the awareness about wake turbulence encounter risk in real time, the wake turbulence...
|
Activity
|
|
Modify taxi route
|
For different reasons, the taxi route may need to be modified. It may be re-calculated by the...
|
Activity
|
|
Modify trajectory
|
—
|
Activity
|
|
Monitor aircraft and assess traffic situation
|
The Executive Controller constantly assesses the traffic situation, monitoring all flights and...
|
Activity
|
|
Monitor Airport Conformance
|
The introduction of Electronic Flight Strips (EFS) means that the instructions given by the ATCO...
|
Activity
|
|
Monitor and Separate Traffic
|
This corresponds to the tasks of controllers to provide separation corresponding to the...
|
Activity
|
|
Monitor arrivals and request late tweaks
|
ACC/Approach supervisor. Responsibilities in coupled AMAN/DMAN context. Coordinate with Airport...
|
Activity
|
|
Monitor CCO procedure execution
|
The controller monitors the flight to detect deviations from the expected aircraft behaviour.
|
Activity
|
|
Monitor CDO procedure execution
|
The controller monitors the flight to detect deviations from the expected aircraft behaviour.
If...
|
Activity
|
|
Monitor changes at airport level
|
[DOD 7.2] Local Capacity Management and Airport Ops Support monitor regularly the evolution of...
|
Activity
|
|
Monitor changes at local level
|
[DOD 7.2] Local Capacity Management and Airport Ops Support monitor regularly the evolution of...
|
Activity
|
|
Monitor clearance implementation
|
The ATC system FDP updates the planning trajectory to include the clearance implementation...
|
Activity
|
|
Monitor Conflicting Clearance
|
Any clearance input in the ATC system will be a triggering event for the ATC system to detect any...
|
Activity
|
|
Monitor crisis measure
|
—
|
Activity
|
|
Monitor de-complexing solution implementation
|
Activity related to the monitoring of the de-complexing solution’s implementation and impact. If...
|
Activity
|
|
Monitor departure
|
Monitor the spacing between departing aircraft before transferring them to the TMA Controllers.
|
Activity
|
|
Monitor departures and request late tweaks
|
Airport Tower Supervisor. Responsibilities in coupled AMAN/DMAN context. Coordinate with Approach...
|
Activity
|
|
Monitor distance from designated aircraft while executing the specific procedure
|
The flight crew manages the aircraft speed according to the spacing instruction (in time or...
|
Activity
|
|
Monitor IM clearance execution
|
The controller monitors the execution of the IM Operation until the Planned Termination Point is...
|
Activity
|
|
Monitor landing trajectory and landing roll
|
Both Planning/MSP and Executive Controllers monitor the required flight adherence to cleared...
|
Activity
|
|
Monitor measures
|
[DOD 7.2 modelling] Following their implementation, ATFCM measures are monitored through relevant...
|
Activity
|
|
Monitor missed approach trajectory
|
The pilot monitors the missed approach and adjusts if needed the trajectory until above MSA...
|
Activity
|
|
Monitor Network Demand and Capacity
|
—
|
Activity
|
|
Monitor potential and actual infringements in the NTZ
|
Final Approach Controller monitors the NTZ (for potential infringements, likely supported by...
|
Activity
|
|
Monitor resolving action
|
After the provision of the required ATC instruction, the implementation is verified and the...
|
Activity
|
|
Monitor STAM
|
—
|
Activity
|
|
Monitor surrounding traffic
|
[SURF-ITA] will utilize surveillance data that are available at sufficient quality and...
|
Activity
|
|
Monitor TBS Operations
|
Approach controllers are required to be provided with the means to check and amend the sequence...
|
Activity
|
|
Monitor the application of DCB/DDCB measures
|
[DOD 7.2 modelling] Following their implementation, dDCB measures are monitored through relevant...
|
Activity
|
|
Monitor the crisis
|
—
|
Activity
|
|
Monitor the Network effect
|
[DOD 7.2 modelling] Following their implementation, ATFCM measures are monitored through relevant...
|
Activity
|
|
Monitor TPO execution
|
The controller monitors the execution of TPO.
|
Activity
|
|
Monitor traffic while executing a vehicle route
|
[AO-0105]
An alert is triggered when the vehicle is moving behind an aircraft on the same...
|
Activity
|
|
Monitor trajectory until DH
|
The pilot monitors the approach until DH, looking at the availability of guidance, adherence to...
|
Activity
|
|
Notify ARES de-activation
|
—
|
Activity
|
|
Notify ATC of impossibility to continue IM operation
|
The Flight Crew notifies ATC that they are unable to continue the IM operation, and waits for ATC...
|
Activity
|
|
Notify ATC of onboard IM operation termination
|
After a flight crew-initiated termination of the IM execution, the flight crew notifies the...
|
Activity
|
|
Notify next unit of change of frequency
|
The Transferring ATSU automatically updates the Flight Object to indicate that the flight has...
|
Activity
|
|
Notify of abnormal approach speed
|
See the description of Contact Approach Controller.
|
Activity
|
|
Notify of abnormal landing statibilisation speed profile
|
See the description of Contact Approach Controller.
|
Activity
|
|
Notify Priority Error (incompatible)
|
—
|
Activity
|
|
Offer coordination
|
The Transferring ATSU controller team proposes coordination to the Accepting ATSU via the...
|
Activity
|
|
Open New Routes
|
When a predicted flow rate or complexity is classified as Low but there is a lot of demand from...
|
Activity
|
|
Operate according to RNP 1 SID
|
—
|
Activity
|
|
Operate according to RNP 1 STAR
|
Aircraft flight path will be determined by the specific STAR selected in the FMS and will operate...
|
Activity
|
|
Optimize the sector configuration
|
[DOD 7.2 modelling] The Local Traffic Manager and the Flow Manager identify the optimum sector...
|
Activity
|
|
Perform 2D comparison of EPP route against FO route across IOP area
|
C-ATSU system retrieves the ground planning trajectory from the Flight Object.
C-ATSU system...
|
Activity
|
|
Perform a task inside the Runway Zone
|
[AO-0105] The vehicle performs different operations inside the Runway Zone : runway inspection,...
|
Activity
|
|
Perform AIRAC cycle update of hte local ASM system
|
—
|
Activity
|
|
Perform collision avoidance manoeuvre
|
In the event of an RA, it is automatically downlinked to the ground for controllers to build the...
|
Activity
|
|
Perform conflict detection within AOI
|
The conflict detection tools in ATS unit A use the latest revised flight intent for Flight 002...
|
Activity
|
|
Perform conformance monitoring
|
The conformance monitoring tools in ATS unit detect that the actual progress of the flight...
|
Activity
|
|
Perform consistency check at Regional level
|
NM performs a network impact assessment and provides the result back to the Sub-regional/National...
|
Activity
|
|
Perform CTA cancellation
|
The Controlling ATSU, due to the evolving traffic situation, may elect to cancel the CTA.
The...
|
Activity
|
|
Perform internal consistency check
|
—
|
Activity
|
|
Perform potential mid-air collision detection
|
The surrounding collaborative traffic is detected and the relative positions of the corresponding...
|
Activity
|
|
Perform short-term conflict detection
|
The current and predicted three-dimensional positions of aircraft with pressure-altitude...
|
Activity
|
|
Perform Strategic Network assessment and major event de-confliction
|
NM performs a network impact assessment and provides the result back to the Sub-regional/National...
|
Activity
|
|
Perform Syntax and Semantic Checks
|
—
|
Activity
|
|
Perform TRACT conflict detection
|
—
|
Activity
|
|
Perform Trajectory Validation
|
—
|
Activity
|
|
Plan Arrivals
|
The destination AMAN calculates and updates the arrival sequence and the advisories (e.g. TTL)...
|
Activity
|
|
Plan Departures
|
Each airport creates a sequence of departures. A-CDM and DMAN create the sequence at large...
|
Activity
|
|
Plan vehicle route
|
The [RGA] (Route Generation Algorithm) calculates a planned route in automatic mode, based on...
|
Activity
|
|
Plan/execute long-range arrival pre-sequence
|
The AMAN receives flight progress information for every aircraft bound for the arrival-managed...
|
Activity
|
|
Plan/Update Arrival Sequence
|
The planning and updating of the arrival sequence can involve one single Airport AMAN in a single...
|
Activity
|
|
Point flight to 3rd ATSU
|
The upstream ATSU controller team points the flight to the Third Party ATSU via the HMI.
The...
|
Activity
|
|
Point flight to D-ATSU
|
The upstream ATSU controller team points the flight to the downstream ATSU via the HMI, along...
|
Activity
|
|
Pre-notify activation of the ARES
|
The TRAMON then activates the TAXI Call function via the ATC System choosing a time frame...
|
Activity
|
|
Predict Load and Complexity at TMA Exit Fix
|
The TMA Manager Tool continuously monitors predicted flow rates and traffic complexity at TMA...
|
Activity
|
|
Predict magnitude of bunching at En Route sector with converging inbound streams to TMA
|
The CMAN of the formerly called E-TMA, predicts the magnitude of bunching using AMAN inputs,...
|
Activity
|
|
Prepare Airport DCB scenarios
|
—
|
Activity
|
|
Prepare and coordinate DCB solutions at Network level
|
[DOD 7.2 modelling] DCB solutions are prepared sufficiently in advance at network level and...
|
Activity
|
|
Prepare and select de-complexing solution implementation
|
Among the potential de-complexing measures, EAP will make a full evaluation of the solution for...
|
Activity
|
|
Prepare Draft AUP/UUP
|
At x time, the AMC user prepares the Draft AUP/UUP for the D-day. The Draft AUP/UUP consists of...
|
Activity
|
|
Prepare STAM
|
after having performed the imbalance/complexity analysis, the INAP function analyzes the possible...
|
Activity
|
|
Present separation to Arrival Controller
|
The separation to be applied in approach is the results of multiple customisation of separation...
|
Activity
|
|
Present separation to Tower Controller
|
The separation to be applied for departure is the results of multiple customisation of separation...
|
Activity
|
|
Proceed visually or VFR until the PinS point
|
The Rotorcraft crew flies the initial departure segment in VFR or proceeding visually, until...
|
Activity
|
|
Promote draft AUP/UUP to ready status
|
Once the draft AUP/UUP is considered matured and the planned airspace allocation consolidated,...
|
Activity
|
|
Propose a crisis measure at Crisis Cell level
|
—
|
Activity
|
|
Propose a crisis measure at Network level
|
—
|
Activity
|
|
Propose alternative solutions according to rules defined in strategic phase
|
Static Data: In case the static data is not consistent, update the static data, coordinate it...
|
Activity
|
|
Propose CTA
|
The AMAN of the destination ATSU calculates the required time constraint (time and fix) for the...
|
Activity
|
|
Propose Departures Restrictions
|
When a predicted flow rate or complexity at a fix is classified as High, the TMA Manager will...
|
Activity
|
|
Propose exchange of ATFM slots and/or departure times
|
[07.02-D28-Step1 Release 4 DOD] §2.2.7:
ATFM Slot Swapping Enhancement: The enhanced...
|
Activity
|
|
Propose revision to coordination level
|
The ATSU controller team proposes a revision to the coordinated level via the HMI.
The ATSU...
|
Activity
|
|
Propose revision to route and coordination point
|
The ATSU controller team proposes a direct routing across the AoR boundary to the target ATSU via...
|
Activity
|
|
Provide 2D RNP clearance
|
Aircraft are cleared to perform the 2D (lateral) transition/approach procedure from the IAF to...
|
Activity
|
|
Provide 3D RNP clearance
|
Aircraft are cleared to perform the 3D (lateral/vertical) transition/approach procedure from the...
|
Activity
|
|
Provide ADD
|
Once the aircraft is airborne and detected by the ATS unit’s surveillance, the ATS unit...
|
Activity
|
|
Provide additional FOC data
|
—
|
Activity
|
|
Provide Advisory/Caution alerts
|
The situation can still be considered as normal but the current trend is that, if nothing...
|
Activity
|
|
Provide aircraft with instructions according to TTL or target time advisory at IMP
|
When it is possible to transfer a significant delay (more than 12 minutes) from the TMA to the En...
|
Activity
|
|
Provide Amended IM Clearance and check acceptance
|
The controller communicates to the flight crew the Amended IM Clearance. If it is accepted by the...
|
Activity
|
|
Provide arrival procedure clearance
|
The En Route controller provides the pilot with an arrival procedure clearance. This follows and...
|
Activity
|
|
Provide ASM support (AMC)
|
Description: This activity involves analysing the airspace demands (originating from the various...
|
Activity
|
|
Provide departure clearance (Rotorcraft)
|
The controller, accordingly to the filled flight plan, provides the departure clearance and...
|
Activity
|
|
Provide departure information to AMAN
|
Satellite airport within Eligibility Horizon provides the AMAN with information on the relevant...
|
Activity
|
|
Provide ETA Min/Max
|
The current controlling ATS unit automatically updates the Flight Object with the downlinked...
|
Activity
|
|
Provide ETO Min/Max
|
—
|
Activity
|
|
Provide guidance on apron
|
In some airports, the movement on the apron area is under the responsability of Airport. In this...
|
Activity
|
|
Provide hold short at runway guidance
|
Tower ground controller instructs via R/T the Flight Crew to hold short at runway hold...
|
Activity
|
|
Provide initial arrival sequence
|
The approach controller provides the En Route controller with the initial arrival sequence. This...
|
Activity
|
|
Provide instruction to carry out the arrival sequence
|
Following the arrival sequence given by AMAN and thanks to the different separations techniques...
|
Activity
|
|
Provide landing clearance
|
The tower controller provides the landing clearance as well as the wind information while...
|
Activity
|
|
Provide lateral separation instruction
|
The controller may provide lateral separation instructions in order to ensure safe operations and...
|
Activity
|
|
Provide Local Impact Assessment
|
Analyse AUP/UUP change proposal on the local situation.
|
Activity
|
|
Provide Network Impact Assessment
|
The Draft AUP/UUP is sent to the NM systems for validation. Errors/warnings, if any, are sent...
|
Activity
|
|
Provide pilot response
|
The pilot responds to an ATC instruction.
In the context of a CTA allocation, the flight crew...
|
Activity
|
|
Provide radar vectoring instructions
|
In order to ensure safe operations, exceptionally, the controller intervenes tactically and...
|
Activity
|
|
Provide REL/RIL/THL lights
|
RWSL commands the field lighting system to turn on and off the lights of each RWSL function...
|
Activity
|
|
Provide resources and equipment capabilities
|
—
|
Activity
|
|
Provide resume to CTA instruction
|
The Executive Controller instructs the aircraft to resume own navigation and to resume to its...
|
Activity
|
|
Provide retain CTA and tactical instructions
|
The Executive Controller issues an explicit instruction to retain CTA (keep RTA in background)...
|
Activity
|
|
Provide Retain/Resume CTA instruction
|
The Executive Controller issues an explicit instruction to retain CTA (keep RTA in background)...
|
Activity
|
|
Provide runway crossing guidance
|
The Tower Runway Controller receives a request to cross a runway via R/T. He informs the system...
|
Activity
|
|
Provide SBT
|
—
|
Activity
|
|
Provide speed instruction
|
The approach controller can give a speed restriction to all involved aircraft to get a uniform...
|
Activity
|
|
Provide start-up and push-back instructions
|
Upon ATSU system receipt of a push back request, the request is displayed on the Tower Ground...
|
Activity
|
|
Provide Tactical Instructions
|
—
|
Activity
|
|
Provide executive control data
|
Whenever the tactical controller at the Transferring ATSU issues a tactical instruction to the...
|
Activity
|
|
Provide tactical situational awareness to controller
|
The downstream ATS unit is made aware of the updates to the executive control data in the Flight...
|
Activity
|
|
Provide tactical instructions to flight crew
|
The controller provides directives for the purpose of requiring a pilot to take a specific action...
|
Activity
|
|
Provide take-off clearance
|
The Tower Runway Controller issues the take-off clearance to the Flight Crew using R/T [06.02...
|
Activity
|
|
Provide taxi route clearance
|
The Tower Ground Controller issues the taxi instruction via R/T or data link by making an input...
|
Activity
|
|
Provide taxi-in route
|
[On request of the Flight Crew,] the planned taxi-in route is automatically uplinked. The...
|
Activity
|
|
Provide taxi-out route
|
When the Flight Crew requests ATC Departure Clearance and Planned Taxi-out route, the Tower...
|
Activity
|
|
Provide TPO instruction
|
Controller instructs flight crew to execute TPO (right or left by specified number of NM).
|
Activity
|
|
Provide vehicle position
|
The vehicle must be equipped with ADS-B out to send position reports. [06.07.01 D39]
|
Activity
|
|
Provide vehicle routing guidance
|
[When receiving a request from the Tow vehicle driver], the Tower Ground Controller verifies the...
|
Activity
|
|
Provide vertical separation instruction
|
The controller may provide vertical separation instructions mainly as a means to ensure safe...
|
Activity
|
|
Provide Warning alert
|
The role of a warning alert is to inform pilots of an imminent risk of collision they may miss...
|
Activity
|
|
Provide weather information
|
This activity involves handling requests and proving weather information concerning the flight or...
|
Activity
|
|
Publish Airport Seasonal Schedule
|
—
|
Activity
|
|
Publish Airspace availability
|
—
|
Activity
|
|
Publish airspace data in the NOP
|
—
|
Activity
|
|
Publish and update Airspace Configuration in the NOP
|
The Regional Network Plan is approved and promulgated by the Sub-Regional Manager. Airspace is...
|
Activity
|
|
Publish and update the NOP
|
DCB solutions are listed and their descriptions are published in the NOP.
|
Activity
|
|
Publish ARES activation in the NOP
|
—
|
Activity
|
|
Publish ARES activation status update in the NOP
|
—
|
Activity
|
|
Publish ARES de-activation in the NOP
|
—
|
Activity
|
|
Publish ARES pre-activation in the NOP
|
—
|
Activity
|
|
Publish Capacity Constraint Situation
|
—
|
Activity
|
|
Publish CTA status
|
The current controlling ATS unit automatically updates the operational status of the CTA in the...
|
Activity
|
|
Publish Demand Forecast
|
—
|
Activity
|
|
Publish Early Intent Informatiion
|
Description: This activity involves the WOC submitting the Early Flight Intent to Network...
|
Activity
|
|
Publish Early Intent Information in Network Operations Plan
|
Description: This activity involves publishing Early Flight Intent information for a mission in...
|
Activity
|
|
Publish EPP with unchecked flags
|
The ATSU system updates the Flight Object with the downlinked EPP data, and ‘unchecked’ status...
|
Activity
|
|
Publish in the NOP
|
—
|
Activity
|
|
Publish iRMT in the NOP
|
Description:This activity involves making available via the Network Operations Plan all...
|
Activity
|
|
Publish iSBT/iSMT
|
—
|
Activity
|
|
Publish Long Term Planning Data in NOP
|
The LT planning data are available also in the Network Operations Plan (NOP)
|
Activity
|
|
Publish Priority on Flights
|
—
|
Activity
|
|
Publish UDPP Hotspot List Solution (w UIBT UOBT)
|
—
|
Activity
|
|
Raise alert to relevant stakeholders
|
—
|
Activity
|
|
Raise D/C Imbalance Alert
|
—
|
Activity
|
|
Re-engage RTA
|
(1) The flight crew reinstates the RTA and the FMS updates its trajectory predictions. The flight...
|
Activity
|
|
Receive AMAN constraint
|
The satellite airport receives a TTL figure for the departure aircraft in the AMAN arrival...
|
Activity
|
|
Receive CTA Rejection
|
The destination ATS unit retrieves the upstream ATCO’s response to the CTA Proposal from the...
|
Activity
|
|
Receive Early Intent Information
|
Description: This activity involves receiving early intent information on a mission trajectory,...
|
Activity
|
|
Receive pilot reports
|
The controller receives pilot reports.
Specificallly in the approach context, while following a...
|
Activity
|
|
Receive Pilot Response
|
The destination ATS unit retrieves the published CTA Status (i.e. flight crew response to their...
|
Activity
|
|
Receive resume to CTA instruction
|
The flight crew receives and acknowledges instructions to resume own navigation and return to CTA.
|
Activity
|
|
Receive retain CTA and tactical instructions
|
The flight crew receives and acknowledges explicit instructions to retain CTA (keep RTA in...
|
Activity
|
|
Receive RNP clearance
|
Aircraft receive the clearance to commence the RNP transition approach via R/T / voice.
|
Activity
|
|
Receive the updated information that can be shared (e.g. with airspace users)
|
—
|
Activity
|
|
Receive TPO instruction
|
Flight crew receives and acknowledges instruction (with readback).
|
Activity
|
|
Reception and distribution of AOP related Flight Plan information
|
This activity involves handling all data exchanges between the Airport Operations Centre and...
|
Activity
|
|
Reception and update of Extended/Reference Flight Plan Information
|
This activity involves the ATC FDPS systems receiving the latest Extended Flight Plan updates or...
|
Activity
|
|
Reception of improved iSMT Information
|
Description: This activity involves the ATC FDPS systems receiving the latest improved OAT Flight...
|
Activity
|
|
Reconciliate Arrival information and propose solutions
|
—
|
Activity
|
|
Record and monitor ATFM slot exchange
|
[07.02-D28-Step1 Release 4 DOD] §4.2.2.1: The Network Manager monitors the flight exchanges and...
|
Activity
|
|
Record and monitor departure time exchange
|
As for the Network Manager (Record and Monitor ATFM slot exchange), the CDM airport monitors the...
|
Activity
|
|
Record and publish STAM implementation
|
—
|
Activity
|
|
Record ATOT
|
The ATM System detects take-off and records the ATOT [06.02 D122 DOD Step1 Yearly Update 2014].
|
Activity
|
|
Reduce separation according to TBS rules
|
When the arrival separation is a distance value, the separation (in time) between two aircraft...
|
Activity
|
|
Refer to tactical who assesses problems
|
The planning controller highlights issue to the tactical controller. The tactical controller...
|
Activity
|
|
Reference Flight Plan Publishing
|
This activity involves the FOC including all agreed Extended Flight Plan information into the...
|
Activity
|
|
Refine Airport Resource and Capabilities
|
—
|
Activity
|
|
Refine Airspace Configuration
|
—
|
Activity
|
|
Refine resource and equipment capabilities
|
—
|
Activity
|
|
Refine Scheduled Flights (Updating SBT to RBT/ATV)
|
—
|
Activity
|
|
Refine/update ARES
|
Description: This activity involves refining the airspace volume needed for the mission,...
|
Activity
|
|
Refuse ATFM slot exchange
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will refuse or accept the proposed...
|
Activity
|
|
Refuse departure time exchange
|
[07.02 D28-Step 1 Release 4 DOD]§4.2.2.1: NMF and Airport will refuse or accept the proposed...
|
Activity
|
|
Reject flight
|
If the flight cannot be reasonably accepted into the sector the coordination is to be rejected.
|
Activity
|
|
Reject pilot request
|
The executive controller in ATS unit B informs Flight 002 that ATC are unable to grant the...
|
Activity
|
|
Reject Proposed CTA
|
If the controller assesses that they cannot facilitate the aircraft flying on its own speed...
|
Activity
|
|
Reject release of flight
|
The controller team at the Transferring ATSU rejects the release request via the HMI.
The...
|
Activity
|
|
Release of AUP/UUP
|
When all AUPs/UUPs are in status Ready, the CADF (CADF position in the NM Ops room is responsible...
|
Activity
|
|
Relinquish responsibility for flight
|
The Transferring ATSU system automatically retrieves the updated transfer status from the Flight...
|
Activity
|
|
Remove 3rd ATSU from distribution
|
The point indication is removed from the Flight Object, and the Third Party ATSU is removed from...
|
Activity
|
|
Remove discrepancy indication
|
The controller is made aware through the HMI of the flight crew response to the uplinked Route...
|
Activity
|
|
Remove flight plan from expected flights
|
The Accepting ATSU 1 system removes the flight plan from the ground system (if appropriate),...
|
Activity
|
|
Remove highlight of the flight from HMI
|
Following cancellation of the point function, the flight is no longer highlighted in the HMI.
|
Activity
|
|
Remove level constraint discrepancy indication
|
The controller is made aware through the HMI of the flight crew response to the uplinked 3D Route...
|
Activity
|
|
Report change to filed speed
|
The pilot informs the tactical controller in the Upstream ATSU of a change to the filed flight...
|
Activity
|
|
Request a ground movement
|
The Airport Operations Centre (AOC) plans the Ground Movement in the system, stating the Starting...
|
Activity
|
|
Request ATFCM measures
|
[DOD 7.2 modelling] When needed, the Local Traffic Manager and/or the Flow Manager ask the...
|
Activity
|
|
Request C-ATSU to re-clear flight
|
If the controller decides to revise the route held by the aircraft, then the controller uses the...
|
Activity
|
|
Request CDR2 availability and airspace restrictions
|
Traffic demand is known (at least historical data are available). The FMP provides the need in...
|
Activity
|
|
Request Crisis Event management
|
[DOD 7.2 modelling] Following the imbalance analysis, the Local Traffic Manager and/or the Flow...
|
Activity
|
|
Request cruise level change
|
The pilot of Flight 002 requests a new cruise level to ATC in the current controlling ATS unit...
|
Activity
|
|
Request demand change
|
—
|
Activity
|
|
Request departure clearance
|
The Rotorcraft crew requests departure clearance and relative instruction, accordingly to the...
|
Activity
|
|
Request ETA Min/Max
|
Upon receipt of the reliable ETA min/max service request, the current controlling ATS unit sends...
|
Activity
|
|
Request ETA Min/Max Service
|
Upon request of the AMAN, the destination ATS unit automatically requests the reliable ETA...
|
Activity
|
|
Request flight crew report
|
The approach controller requires a flight crew report upon path interception, final course...
|
Activity
|
|
Request flight crew to disable FRT
|
Instruction is passed to flight crew to disable FRT functionality via input to the FMS.
|
Activity
|
|
Request flight crew to disable RF
|
Instruction is passed to flight crew to disable RF functionality via input to the FMS.
|
Activity
|
|
Request flight on frequency
|
—
|
Activity
|
|
Request network assessment
|
ATC inform local NM of the request if time permits / if the situation permits.
Note. - this is...
|
Activity
|
|
Request provision of EPP
|
At a predetermined time and/or distance from the aircraft entering C-ATSU’s area of...
|
Activity
|
|
Request provision of EPP to 3rd party ATSU
|
At a predetermined time and/or distance from the aircraft entering C-ATSU’s area of...
|
Activity
|
|
Request release of flight
|
Following the agreement of a set of coordination data, the controller team at the Accepting ATSU...
|
Activity
|
|
Request revised coordination level
|
Following the agreement of a set of coordination data, the ATSU controller requests a revision to...
|
Activity
|
|
Request RNP to ILS/GLS/LPV approach procedure
|
After ToD (or better in the future, before), the pilot checks the approach and runway in use and...
|
Activity
|
|
Request specific procedure
|
The pilots request a specific procedure when they identify they could improve their flight...
|
Activity
|
|
Request sub-regional or regional action
|
[DOD 7.2 Modelling] The Local Traffic Manager or the Flow Manager escalates the coordination to...
|
Activity
|
|
Request Support
|
CDM if required to support impact assessment and airspace adjustements
|
Activity
|
|
Request taxi-in route
|
The Flight Crew requests the Planned Taxi-In route. [07.07.02 D76]
|
Activity
|
|
Request taxi-out route
|
The Flight Crew requests ATC Departure Clearance and Planned Taxi-out route via data link.
|
Activity
|
|
Request the change of Airspace reservation
|
—
|
Activity
|
|
Request the change of Airspace Reservation/Mission Trajectory
|
—
|
Activity
|
|
Request Trial
|
—
|
Activity
|
|
Resolve level constraint discrepancy through R/T
|
The controller is made aware through the HMI of the flight crew response to the uplinked 3D Route...
|
Activity
|
|
Respond to cancellation request
|
—
|
Activity
|
|
Restore adherence to clearance
|
If a detected deviation is considered as significant, the controller takes the appropriate...
|
Activity
|
|
Resume assigned clearance
|
The aircraft shall promptly return to the terms of the ATC instruction or clearance when the...
|
Activity
|
|
Resume conventional control
|
The controller stops the on-going procedure and resumes conventional control.
|
Activity
|
|
Resume IM operation
|
After an IM suspension and temporary conventional control, the controller can resume the IM...
|
Activity
|
|
Retain RTA in the background and follow ATC instructions
|
The flight crew retains the RTA (holding it in the background) and executes the ATC instruction.
|
Activity
|
|
Retrieve EPP and consistency check status from FO
|
D-ATSU system retrieves the latest EPP information, along with consistency status information...
|
Activity
|
|
Retrieve revised coordination data and display it to controller
|
The ATSU retrieves the revised coordination data from the Flight Object and displays it on the...
|
Activity
|
|
Retrieve revised route from FO
|
C-ATSU controller receives the request from D-ATSU 3 to re-clear the flight in accordance with...
|
Activity
|
|
Revise airborne trajectory with CTO
|
—
|
Activity
|
|
Revise aircraft 2D route
|
The approach controller can revise the aircraft 2D route to ensure separation (possibly in...
|
Activity
|
|
Revise coordination level
|
Following the agreement of a set of coordination data, the controller in the Transferring ATSU...
|
Activity
|
|
Revise coordination time
|
The ATSU system automatically revises the Flight object with the updated planning trajectory,...
|
Activity
|
|
Revise coordination time and point
|
The ATSU system automatically revises the Flight object with the updated planning trajectory,...
|
Activity
|
|
Revise entry conditions if needed in coordination with upstream sector
|
Entry coordination is amended as required in agreement with offering sector.
|
Activity
|
|
Revise planned cruise level
|
The planning controller in ATS unit B (or delegated authority) revises the en-route cruise level...
|
Activity
|
|
Revise planned route
|
ATS Unit revises the planned route in the Flight Object.
|
Activity
|
|
Revise planned trajectory with STAM measure
|
D-ATSU1 concerned by the effect of the future execution of the STAM solution within his area of...
|
Activity
|
|
Revise TTOT
|
If the TTL figure is not null, the satellite airport revises the TTOT accordingly, which delays...
|
Activity
|
|
Roll and exit runway
|
Baseline process.
|
Activity
|
|
Roll-out
|
Baseline process for rolling-out.
|
Activity
|
|
Search and find pre-defined Candidate solution
|
—
|
Activity
|
|
Select appropriate DDCB measure
|
[DOD 7.2 modelling] After having performed the imbalance analysis, the Local Traffic Manager...
|
Activity
|
|
Select clearance to achieve desired profile
|
If there are not planned constraints or agreed coordination actions to respect, the Executive...
|
Activity
|
|
Select clearance to respect agreed constraints or coordinations
|
If there are planned constraints or agreed coordination actions, the Executive Controller will...
|
Activity
|
|
Select DCB Solution
|
1. The DCB calculates KPI forecasts for different alternative runway configurations and capacity...
|
Activity
|
|
Select RNP to ILS/GLS/LPV approach procedure
|
The pilot selects the Runway, Approach (ILS/GLS or LPV) and VIA (RNP segment including RF) and...
|
Activity
|
|
Select TPO
|
Flight crew selects aircraft TPO function.
|
Activity
|
|
Send Landing Data
|
Landing data (landing runway and runway conditions) are sent by the Ground System to the Flight...
|
Activity
|
|
Separate traffic in approach
|
[Baseline] Separate traffic during the approach phase. The idea is to merge arrival streams. See...
|
Activity
|
|
Set-up IM operation
|
The controller determines the interest and feasibility of an IM operation for a given IM and...
|
Activity
|
|
Share airspace data with NM
|
Static airspace data presented for NM impact assessment
|
Activity
|
|
Share and analyse Airspace demand data
|
AMC compares civil and military needs and identifies possible imbalance between demand and...
|
Activity
|
|
Share declared hostpots
|
[7.2 Etienne de Muelenaere] From the activity « Analyse imbalance » an information element must...
|
Activity
|
|
Share FPL update in the NOP
|
—
|
Activity
|
|
Share Hotspot Sequence List
|
—
|
Activity
|
|
Share Hotspot with AUs
|
—
|
Activity
|
|
Share long term planning ASM data
|
National and international exercises are coordinated between military authorities.
Data related...
|
Activity
|
|
Share Reference ARES planning
|
—
|
Activity
|
|
Share updated planned constraints with NM
|
Each identified ATSU shares its updated planned constraints (if any) with NM, according to...
|
Activity
|
|
Specify ARES request
|
[1] Squadron Tiger Leader requests an ARES he defines:
· The ARES;
· The date;
· The slot for...
|
Activity
|
|
Store inconsistency with the iSBT/iSMT
|
—
|
Activity
|
|
Store iSBT/iSMT
|
[DOD 7.2] A number of iterations of iSBT/SMT will be stored as reference data such as: very first...
|
Activity
|
|
Submit and update allocated airport slot data
|
—
|
Activity
|
|
Submit and update iSBT/iSMT
|
[DOD 7.2] An operator is to input to a central database any data available related to a...
|
Activity
|
|
Submit Approved ARES Reservation
|
The WOC submits the ARES approved at national level to the Sub-regional/national ASM.
|
Activity
|
|
Submit iRMT
|
Description:This activity involves the WOC including all improved OAT Flight Plan information...
|
Activity
|
|
Submit iSMT
|
Description: This activity involves sending the improved OAT Flight Plan to Network...
|
Activity
|
|
Submit request for ARES
|
—
|
Activity
|
|
Submit request or modification of ARES
|
—
|
Activity
|
|
Support NM consistency check
|
CDM if required to support impact assessment and airspace adjustements
|
Activity
|
|
Support STAM Implementation (AOLO) if needed
|
—
|
Activity
|
|
Suspend IM execution
|
The flight crew suspends the IM execution on ATC request.
|
Activity
|
|
Suspend IM operation
|
The controller can suspend the IM Operation for traffic flow efficiency reasons, or due to...
|
Activity
|
|
Synchronize trajectories following EAP STAM implementation
|
—
|
Activity
|
|
Take-off
|
Baseline process.
|
Activity
|
|
Terminate IM execution
|
The flight crew can terminate the IM execution on ATC request. The Flight Crew can also terminate...
|
Activity
|
|
Terminate IM operation
|
The controller can terminate the IM Operation for traffic flow efficiency reasons, or due to...
|
Activity
|
|
Terminate TPO instruction
|
Instruction is passed to flight crew to terminate the execution of the TPO.
|
Activity
|
|
Touchdown
|
Baseline process for touchdown.
|
Activity
|
|
Traffic Demand Computation
|
This activity involves computing traffic demand over traffic flows, significant points, airports...
|
Activity
|
|
Transfer flight to Departure Controller
|
The transfer of control at least implies a communication from the controller towards the Flight...
|
Activity
|
|
Transfer flight to tower ground controller
|
The transfer of control at least implies a communication from the controller towards the Flight...
|
Activity
|
|
Transfer flight to tower runway controller
|
The approach controller transfers the aircraft to the control tower frequency.
|
Activity
|
|
Translate ARES Plan to Airspace availability
|
—
|
Activity
|
|
Transmit IM clearance and check acceptance
|
The controller communicates to the flight crew the IM Clearance Type (i.e., the requested IM...
|
Activity
|
|
Transmit target aircraft identification
|
The controller communicates to the flight crew the Target Aircraft Identification and Target...
|
Activity
|
|
Trigger ARES pre-activation
|
As soon as the aircraft planned for a mission in the VPA start to taxi, the Tower controller...
|
Activity
|
|
Turn on segments
|
The AGL system turns on segments (equalling a distance not greater than 300m ahead of the...
|
Activity
|
|
Update Airborne Intended Exit
|
The Ground System confirms or proposes a different planned runway exit to the Flight Deck.
|
Activity
|
|
Update and share ARES status
|
The ASM Support Systems subsequently sends a notification to the Network Management Function...
|
Activity
|
|
Update ARES planning
|
The planning is updated accordingly and automatically
|
Activity
|
|
Update arrival management information
|
If the threshold is overtaken, the information is forwarded to the AMAN in the form an advisory...
|
Activity
|
|
Update ATFM slots and/or departure times
|
Depending on the approval or refusal of the departure time/ATFM slot exchange [UC-NP-29], the...
|
Activity
|
|
Update controller awareness of transfer status
|
The Accepting ATSU system automatically retrieves the updated transfer status from the Flight...
|
Activity
|
|
Update CWP with ARES activation
|
—
|
Activity
|
|
Update CWP with ARES activation status update
|
—
|
Activity
|
|
Update CWP with ARES de-activation
|
—
|
Activity
|
|
Update CWP with ARES pre-activation
|
—
|
Activity
|
|
Update eFPL
|
—
|
Activity
|
|
Update flight plan if needed
|
—
|
Activity
|
|
Update iRBT information (EFPL, TTA/TTO)
|
NM updates the iRBT information (e.g. EFPL and TTA/TTOs) for transmission to the concerned ATSUs.
|
Activity
|
|
Update iRMT ARES VPA
|
—
|
Activity
|
|
Update local planning trajectory
|
The downstream ATSU system retrieves the new speed from the updated Flight Object.
The...
|
Activity
|
|
Update local/subregional LT planning data
|
NM updates the long term planning based on the outcome of the CDM process
|
Activity
|
|
Update planned constraints as needed
|
Each identified ATSU uses the improved planned trajectory for updating its planned constraints as...
|
Activity
|
|
Update planning
|
The Network Manger retrieves the revised flight intent from the Flight Object and updates their...
|
Activity
|
|
Update preliminary eFPL
|
—
|
Activity
|
|
Update Regional systems database
|
NM updates the static airspace data base on the outcome of the CDM process
|
Activity
|
|
Update sector planning
|
ATS Unit retrieves the revised flight intent from the Flight Object to update its sector planning...
|
Activity
|
|
Update taxi-in parameters
|
The planned taxi-in route is automatically uplinked and loaded into the aircraft system. The...
|
Activity
|
|
Update taxi-out parameters
|
The ATC Departure Clearance and the planned taxi-out route are sent to the Flight Crew by the...
|
Activity
|
|
Update the CWP and share airspace status data
|
Pre notification: visualization of the allocated ARES outlines in the ASM Support Systems and at...
|
Activity
|
|
Update the NOP
|
[DOD 7.2 modelling] The dDCB/DCB solutions descriptions and their intended use are updated and...
|
Activity
|
|
Update trajectory
|
ATS unit updates the trajectory estimates in the Flight Object using the latest actual progress...
|
Activity
|
|
Update trajectory with new filed speed
|
—
|
Activity
|
|
Update/Improve local planned trajectory by using the valid iRBT information
|
Each identified ATSU updates/improves its own planned trajectory by using the valid iRBT...
|
Activity
|
|
Uplink descent clearance
|
The ATC controller sends the CPDLC descent when ready clearance uplink.
|
Activity
|
|
Uploading of Reference Flight Plan onto the aircraft FMS
|
This activity involves the flight crew receiving from the FOC the Reference Flight Plan, and...
|
Activity
|
|
Use FOC planning information and ADD to improve demand prediction
|
—
|
Activity
|
|
Use FOC planning information and ADD to improve ground trajectory prediction
|
—
|
Activity
|
|
Use relevant EPP to improve ground trajectory prediction
|
Each concerned ATSU uses relevant EPP information to improve the quality of its ground trajectory...
|
Activity
|
|
Vacate runway
|
In case the Tower Runway Controller has previously made the specific request to the Flight Crew,...
|
Activity
|
|
Vacate the RPA
|
Vacate the RPA following an alert or at the end of the task.
|
Activity
|
|
Validate civil and military FPL
|
As FPL represents a iSBT/SMT, this process should remain consistent with "Check and Validate...
|
Activity
|
|
Validate crisis measure
|
—
|
Activity
|
|
Validate iSMT
|
Description: This activity involves Network Management (in particular the IFPS) validating the...
|
Activity
|
|