eATM Portal

FCM05 — Interactive Rolling NOP

The first steps of the interactive rolling NOP were already implemented through the deployment of the NOP portal (through n-CONECT platform and B2B services). Further information and data have been deployed to support the interactive approach to the NOP (e.g. ADR, DDR2,...) and the access to the NOP data will be more and more available through B2B services. Most of the enablers required are expected to be gradually deployed over this period.

The scope of this Implementation Objective consists in the implementation of a platform that uses the state-of-the-art technologies for creation of a virtual operations room for the physically distributed European ATM network operations, in support of the collaborative NOP. This platform will support the network collaborative rolling processes from strategic to real-time operations, including capabilities for online performance monitoring integrated and feeding back into the collaborative network planning. Also, the platform provides access to post-operational data for offline analysis and performance reporting.

Information and dialogue tools shall be accessed via an ATM Information Portal. Access to information is done in a secure way, tailored according the stakeholders needs and subject to access control rules, so that only those who have an operational need to access particular information are able to do so.
In addition, this Implementation Objective also covers the NM system upgrades related to AOP-NOP B2B interface for data exchanges with selected airports.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

NOTE: The deleted SLoAs ASP01 and ASP02 appear since the 2016 Edition in objective AOM19.1. The deleted SLoA NM11 is addressed by the objective INF08.1

Edition
2022
Stakeholders
Air Navigation Service Provider / Airport Operator / Airspace Users / Network Manager
Type
PCP
Scope
ECAC+
Status
Removed

Applicability Area(s) and Timescales

Applicability Area:
All ECAC States except: Armenia, Luxembourg, Moldova, North Macedonia. Plus: Israel
Timescales From By Applicable to
Initial operational capability 01-09-2013 - Applicability Area
Full operational capability - 01-01-2022 Applicability Area

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

References

Applicable legislation
Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
-
Operating Environments
Airport
Terminal Airspace
En-Route
Network

Expected Performance Benefits

Safety
Enhanced by improved sharing of the network situation.
Capacity
Small benefits through improved use of the airport and airspace capacity resulting from a better knowledge of the airspace availability and of the traffic demand.
Operational efficiency
-
Cost efficiency
Enhanced through use of cost efficient tools to access network information instead of expensive local tools or procedures.
Environment
-
Security
-
  Code Title From By Related Enablers
 
REG01 Review, as appropriate, the safety argument of the changes to the ASM system, supporting the implementation of interactive Rolling NOP by the NM DELETED
 
ASP01 Upgrade the automated ASM support system with the capability of AIXM 5.1 B2B data exchange with NM DELETED
 
ASP02 Perform an integration of the automated ASM support systems with the Network DELETED
 
ASP03 Produce a safety assessment on the upgrade of automated ASM support systems to the AIXM 5.1 capability DELETED
 
ASP04 Develop and implement ATFCM procedures for interaction with the NOP
  • 01-09-2016
  • 01-01-2022
 
ASP05 Train the relevant personnel for interaction with the NOP
  • 01-09-2016
  • 01-01-2022
 
APO01 Provide the required data to the Network Manager for DDR FINALISED
 
APO02 Perform the integration of the AOP with the NOP
  • 01-01-2015
  • 01-01-2022
 
USE01 Provide the required data to the Network Manager for DDR FINALISED
 
NM01 ADR to provide, common and consolidated view of European airspace data containing both static and dynamic digital data FINALISED
 
NM02 Upgrade NM system for external user access to the airspace data repository (making restrictions available in AIXM 5.1 format via B2B) FINALISED
 
NM03 Equip Airspace management system with tools for collection of airspace data (Interoperability with ASM tools in AIXM 5.1) FINALISED
 
NM04 Perform an integration of ASM support systems with the Network FINALISED
 
NM05 Upgrade NM systems to allow the access of interested users to the Demand Data Repository FINALISED
 
NM06 Implement FCM Procedures for on-line access/update to the NOP and notification of updates FINALISED
 
NM07 Upgrade NM systems to allow FMP to remote access simulation via the NOP Portal (create of simulations and assessment of the results) and in a second step to edit scenario measures (regulation, config, capacities,...) prior to running simulations FINALISED
 
NM08 Flight Plan filing capability directly via the NOP portal FINALISED
 
NM09 Develop AOP/NOP interfaces FINALISED
 
NM10 Integrate the AOPs into the Network Operation Plan
  • 01-01-2016
  • 01-01-2022
 
NM11 Develop Network Manager B2B services DELETED
 
NM12 Enhance the NM technical platform and services
  • 01-09-2016
  • 01-01-2022
 
NM13 Implement ATFCM procedures
  • 01-09-2016
  • 01-01-2022
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM05
 
20130901_20220101
REG01 (DELETED)
20130901_20161231
ASP01 (DELETED)
20130901_20171231
ASP02 (DELETED)
20130901_20171231
ASP03 (DELETED)
20130901_20171231
ASP04
 
20160901_20220101
ASP05
 
20160901_20220101
APO01 (FINALISED)
20130901_20220101
APO02
 
20150101_20220101
USE01 (FINALISED)
20130901_20220101
NM01 (FINALISED)
20130901_20141231
NM02 (FINALISED)
20130901_20141231
NM03 (FINALISED)
20130901_20141231
NM04 (FINALISED)
20130901_20171231
NM05 (FINALISED)
20130901_20130930
NM06 (FINALISED)
20130901_20171231
NM07 (FINALISED)
20130901_20131231
NM08 (FINALISED)
20130901_20141231
NM09 (FINALISED)
20150101_20220101
NM10
20160101_20220101
NM11 (DELETED)
20150101_20171231
NM12
 
20160901_20220101
NM13
 
20160901_20220101

Supporting Material

Title Related SLoAs

EUROCONTROL - NOP Portal User Guide - Edition 21.5-119

https://www.eurocontrol.int/sites/default/files/content/documents/nm/network-operations/user-guides/nop-portal-user-guide-current.pdf

ASP04, ASP05, NM13

SJU - OFA 05.01.01 - Airport Operations Centre Definition - Operational Service and Environment Definition Part 1 - 00.03.00 / 12/2014

-

APO02, NM10

SJU - SESAR Solution 20: Data Pack for initial collaborative Network Operations Plan (NOP)

https://www.sesarju.eu/sesar-solutions/initial-collaborative-network-operations-plan-nop

ASP04, ASP05, NM10, NM12, NM13

SJU - SESAR Solution 21: Data Pack for AOP-NOP seamless integration

http://www.sesarju.eu/sesar-solutions/high-performing-airport-operations/airport-operations-plan-aop-and-its-seamless

APO02

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
03/2013
Latest objective review at expert level
05/2013
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
07/2013
Latest change to objective approved/endorsed in
09/2016