The first steps of the interactive rolling NOP were already implemented through the deployment of the NOP portal (through n-CONECT platform and B2B services). Further information and data have been deployed to support the interactive approach to the NOP (e.g. ADR, DDR2,...) and the access to the NOP data will be more and more available through B2B services. Most of the enablers required are expected to be gradually deployed over this period.
The scope of this Implementation Objective consists in the implementation of a platform that uses the state-of-the-art technologies for creation of a virtual operations room for the physically distributed European ATM network operations, in support of the collaborative NOP. This platform will support the network collaborative rolling processes from strategic to real-time operations, including capabilities for online performance monitoring integrated and feeding back into the collaborative network planning. Also, the platform provides access to post-operational data for offline analysis and performance reporting.
Information and dialogue tools shall be accessed via an ATM Information Portal. Access to information is done in a secure way, tailored according the stakeholders needs and subject to access control rules, so that only those who have an operational need to access particular information are able to do so.
In addition, this Implementation Objective also covers the NM system upgrades related to AOP-NOP B2B interface for data exchanges with selected airports.
NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.
NOTE: The deleted SLoAs ASP01 and ASP02 appear since the 2016 Edition in objective AOM19.1. The deleted SLoA NM11 is addressed by the objective INF08.1
Code | Title | IOC | FOC | Related Elements |
---|---|---|---|---|
AOM-0202 | Enhanced Real-time Civil-Military Coordination of Airspace Utilisation | 31-12-2019 | 31-12-2023 | |
AOM-0205 | Modular Temporary Airspace Structures and Reserved Areas | 31-12-2008 | 31-12-2012 | |
DCB-0102 | Interactive Rolling NOP | 31-12-2009 | 31-12-2013 | |
DCB-0103-A | Initial collaborative NOP | 01-07-2022 | 01-07-2027 | |
IS-0901-A | SWIM for sharing G/G data, traffic flow management information and aeronautical information | 31-12-2023 | 31-12-2029 |
Code | Title | Program | Related Elements | Analysis |
---|---|---|---|---|
#20 | Collaborative NOP for Step 1 | SESAR1 | Analysis |
Code | Dates | |
---|---|---|
1999
99
2000
00
2001
01
2002
02
2003
03
2004
04
2005
05
2006
06
2007
07
2008
08
2009
09
2010
10
2011
11
2012
12
2013
13
2014
14
2015
15
2016
16
2017
17
2018
18
2019
19
2020
20
2021
21
2022
22
2023
23
2024
24
2025
25
|
||
|
||
FCM05 | 20130901_20220101 | |
REG01 (DELETED) | 20130901_20161231 | |
ASP01 (DELETED) | 20130901_20171231 | |
ASP02 (DELETED) | 20130901_20171231 | |
ASP03 (DELETED) | 20130901_20171231 | |
ASP04 | 20160901_20220101 | |
ASP05 | 20160901_20220101 | |
APO01 (FINALISED) | 20130901_20220101 | |
APO02 | 20150101_20220101 | |
USE01 (FINALISED) | 20130901_20220101 | |
NM01 (FINALISED) |
|
20130901_20141231 |
NM02 (FINALISED) |
|
20130901_20141231 |
NM03 (FINALISED) |
|
20130901_20141231 |
NM04 (FINALISED) |
|
20130901_20171231 |
NM05 (FINALISED) |
|
20130901_20130930 |
NM06 (FINALISED) |
|
20130901_20171231 |
NM07 (FINALISED) |
|
20130901_20131231 |
NM08 (FINALISED) |
|
20130901_20141231 |
NM09 (FINALISED) | 20150101_20220101 | |
NM10 |
|
20160101_20220101 |
NM11 (DELETED) | 20150101_20171231 | |
NM12 | 20160901_20220101 | |
NM13 | 20160901_20220101 |
Title | Related SLoAs |
---|---|
EUROCONTROL - NOP Portal User Guide - Edition 21.5-119 |
ASP04, ASP05, NM13 |
SJU - OFA 05.01.01 - Airport Operations Centre Definition - Operational Service and Environment Definition Part 1 - 00.03.00 / 12/2014 |
APO02, NM10 |
SJU - SESAR Solution 20: Data Pack for initial collaborative Network Operations Plan (NOP) https://www.sesarju.eu/sesar-solutions/initial-collaborative-network-operations-plan-nop |
ASP04, ASP05, NM10, NM12, NM13 |
SJU - SESAR Solution 21: Data Pack for AOP-NOP seamless integration |
APO02 |