AOP19 — Departure Management Synchronised with Pre-departure sequencing

Departure Management (DMAN) system is calculating and metering the departure flow to a chosen runway by managing Off-block-Times (via Start-up-Times), obtained from the turn-round process and from A-SMGCS services if available.

DMAN, synchronised with pre-departure sequencing, is a means to improve the departure flows at airports, ensuring flights to depart from the airport, leaving allocated parking stands in a more efficient and optimal order taking account of the available runway capacity and updated taxi-times.

DMAN automatically calculates in real-time and proposes a sequence of departures to be handled by ATC. DMAN integrated with electronic clearance input (ECI) system will instantly update the departure sequence based on A-CDM information and A-SMGCS system input if available.

Pre-departure sequencing is calculated based on Target Take Off Time (TTOT) and Taxi-times resulting in Target Start Approval Time (TSAT) for each flight, taking account of multiple constraints, such as configuration of taxiways and runways, environmental conditions, construction and maintenance on movement area etc. Pre-departure sequencing is also taking into account concerned Stakeholders operational preferences

By monitoring progress of aircraft turnaround processes based on adherence to Target Off-Block Times (TOBT), as well as the operational traffic situation on aprons, taxiways and runways, ATC can provide a TSAT which positions each aircraft in an efficient pre-departure sequence (off-block).

DMAN is an automated enabler delivering TTOT for departures on mixed mode runway and need close coordination/ integration with AMAN to deliver conflict free planning or sequencing.
Airport Stakeholders working according to the principles of A-CDM shall jointly establish pre-departure sequences, taking into account of agreed principles to be applied for specific circumstances such as but not limited to runway holding time, slot adherence, departure routes, airspace user preferences, night curfew, evacuation of stand/gate for arriving aircraft, adverse weather conditions including de-icing, actual taxi/runway capacity, local constraints.

Departure management synchronised with pre-departure sequencing reduces taxi times, increases Air Traffic Flow Management-Slot adherence (ATFM-Slot) and predictability of departure times. Departure management aims at maximising and optimising traffic flow on the chosen runway by setting up a sequence of departing traffic with optimised separations.

System requirements:
• Systems supporting A-CDM (including DMAN) shall be integrated supporting optimised pre-departure sequencing with appropriate information/data for airspace users (Target Off Block Time (TOBT)) and concerned airport stakeholders (contextual data feeding).
• DMAN systems shall elaborate and calculate a collaborative sequencing and provide both TSAT and TTOT, taking into account variable taxi times and shall be updated according to the actual aircraft take-off time (ATOT). DMAN system shall provide the controller with the list of TSAT and TTOT for the aircraft metering.
• An Electronic Clearance Input (ECI) system, shall be implemented, allowing the controller to input all clearances given to aircraft or vehicles into the ATC system. The system shall have appropriate interfaces with systems such as A-SMGCS with ref. Sub-AF 2.3 “Safety nets” ensuring the integration of the instructions given by the controller with complementary data such as flight plan, surveillance, routing, published routes and procedures.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each military authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the military authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to military authorities.

NOTE: The SLoAs listed in this document should be addressed to air navigation service providers as well as to airport operators. This is due to the fact that some airports operate their own ground control units for specific areas of responsibility at the airport. Airport operators providing air traffic control services qualify as ANSPs and are therefore covered by the ASP SLoAs. It is up to each implementer to check and select what is relevant to them, depending on local areas of responsibilities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Airport Operator
Type
CP1
Scope
Airport
Status
Active

Context

Related Elements

Applicability Area(s) and Timescales

Applicability Area 1:
See list of airports in MP Level 3 Implementation Plan - Annexes
( (19 CP1 Airports))
Applicability Area 2:
See list of airports in MP Level 3 Implementation Plan - Annexes
Timescales From By Applicable to
Initial Operational Capability 01-01-2021 - Applicability Area 1
Full Operational Capability / Target Date - 31-12-2022 Applicability Area 1

Links to SESAR Solutions

Links to PCP ATM Sub-Functionalities

ICAO Block Modules: No associated data

References

Applicable legislation
Regulation (EU) No 2021/116 on the establishment of the Common Project One
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
Family 2.1.1 - Departure Management Synchronised with Pre-departure sequencing
Operating Environments
-

Expected Performance Benefits

Safety
Provision of a more stable pre-departure sequence.
Capacity
Enhanced tactical runway scheduling. Reduced waiting and taxi times and runway delays.
Operational efficiency
Increased accuracy of taxi time-out predication and hence take-off time predictability, which in turn allows the aircraft to adhere to their target take-off time (TTOT).
Cost efficiency
-
Environment
Reduced waiting time at the runway holding point, which saves fuel and CO2 emissions and allows air navigation service efficiency.
Security
-
  Code Title From By Related Enablers
 
ASP01 Develop appropriate procedures for synchronisation of initial DMAN with pre-departure sequencing
  • 01-01-2021
  • 31-12-2022
 
ASP02 Integrate upgraded DMAN system with ECI system
  • 01-01-2021
  • 31-12-2022
 
ASP03 Integrate upgraded DMAN systems with A-CDM systems
  • 01-01-2021
  • 31-12-2022
 
ASP04 Integrate DMAN with A-SMGCS
  • 01-01-2021
  • 31-12-2022
 
ASP05 Safety Assessment
  • 01-01-2021
  • 31-12-2022
 
ASP06 Training
  • 01-01-2021
  • 31-12-2022
 
ASP07 Operational use
  • 01-01-2021
  • 31-12-2022
 
APO01 Provide relevant additional data to A-CDM systems to feed DMAN synchronised with pre-departure sequencing
  • 01-01-2021
  • 31-12-2022
 
APO02 Develop appropriate procedures for synchronisation of initial DMAN with pre-departure sequencing
  • 01-01-2021
  • 31-12-2022
 
APO03 Integrate upgraded DMAN systems with A-CDM systems
  • 01-01-2021
  • 31-12-2022
 
APO04 Integrate upgraded DMAN system with ECI system
  • 01-01-2021
  • 31-12-2022
 
APO05 Integrate DMAN with A-SMGCS
  • 01-01-2021
  • 31-12-2022
 
APO06 Safety assessment
  • 01-01-2021
  • 31-12-2022
 
APO07 Training
  • 01-01-2021
  • 31-12-2022
 
APO08 Operational use
  • 01-01-2021
  • 31-12-2022
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOP19
 
20210101_20221231
ASP01
 
83%
20210101_20221231
ASP02
 
87%
20210101_20221231
ASP03
 
82%
20210101_20221231
ASP04
 
71%
20210101_20221231
ASP05
 
47%
20210101_20221231
ASP06
 
80%
20210101_20221231
ASP07
 
76%
20210101_20221231
APO01
 
64%
20210101_20221231
APO02
 
57%
20210101_20221231
APO03
 
51%
20210101_20221231
APO04
 
46%
20210101_20221231
APO05
 
33%
20210101_20221231
APO06
 
32%
20210101_20221231
APO07
 
56%
20210101_20221231
APO08
 
52%
20210101_20221231

Supporting Material

Title Related SLoAs

SDM - Standardisation and Regulation support to CP1 deployment 2021, Deliverable D1.1.1 07/2021

https://www.sesardeploymentmanager.eu/publications/deployment-programme

APO01, APO02, APO03, APO04, APO05, APO06, APO07, ASP01, ASP02, ASP03, ASP04, ASP05, ASP06

Consultation & Approval

Working Arrangement in charge
-
Outline description approved in
-
Latest objective review at expert level
-
Commitment Decision Body
-
Objective approved/endorsed in
-
Latest change to objective approved/endorsed in
-