eATM Portal

FCM08 — Extended Flight Plan

To achieve a common trajectory for ATM planning purposes, the Initial Trajectory Information Sharing requires the improvements in three main areas: quality and completeness of input information, the trajectory calculation method and sharing of the results. The trajectory information will allow a common view on planned trajectories to the various Stakeholders to be used to fulfill their different responsibilities.

The Extended Flight Plan (e-FPL) represents one of the system requirements supporting the Initial Trajectory Information. This objective addresses the message exchange between NM systems, ANSPs ATM system and AU/FOC /WOC flight plan fling systems in respect of collaborative flight planning, improving flight plan distribution and enhanced tactical flow management, using the e-FPL.

The e-FPL will include the planned 4D trajectory of the flight as well as flight performance data in addition to ICAO 2012 FPL data. The first phase that will be implemented should address only the exchange of e-FPL information between AUs and NM. The transmission of e-FPL data to ANSP (flight plan distribution) will be implemented when transition to FF-ICE provisions is achieved.
e-FPL will be processed by AU flight planning systems and sent to IFPS. Initially the Extended Flight Plan exchange will be implemented using the flight data model developed by the NM for B2B and that is currently used for operations. Subsequently, as the FIXM version corresponding to FF-ICE/1 becomes available, the e-FPL will be migrated to FIXM.

NOTE FOR MILITARY AUTHORITIES: It is the responsibility of each Military Authority to review this Objective IN ITS ENTIRETY and address each of the SLoAs that the Military Authority considers RELEVANT for itself. This has to be done on top and above of the review of "MIL" SLoAs which identify actions EXCLUSIVE to MIL Authorities.

Edition
2022
Stakeholders
Air Navigation Service Provider / Airspace Users / Network Manager
Type
PCP
Scope
ECAC+
Status
Removed

Context

Applicability Area(s) and Timescales

Applicability Area:
All ECAC States except: Malta. Plus: Israel
Timescales From By Applicable to
Initial operational capability 01-01-2016 Applicability Area
Full operational capability 01-01-2022 Applicability Area

Links to SESAR Solutions

References

Applicable legislation
Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project
Applicable ICAO Annexes and other references
None
Deployment Programme 2022
Operating Environments
Airport
Terminal Airspace
En-Route
Network

Expected Performance Benefits

Safety
Increased safety due to better traffic predictability. Reduction of over-delivery risk.
Capacity
-
Operational efficiency
Executed trajectory closer to Airspace User's preferences. Enhanced tactical flow management allows improved operational efficiency through better predictability.
Cost efficiency
-
Environment
-
Security
-
  Code Title From By Related Enablers
 
ASP01 Upgrade the ground systems and develop the associated procedures.
  • 01-01-2018
  • 31-12-2021
 
ASP02 Develop, and deliver as necessary, a safety assessment
  • 01-01-2018
  • 31-12-2021
 
USE01 Upgrade the flight planning systems
  • 01-01-2016
  • 31-12-2021
 
USE02 Train the personnel
  • 01-01-2016
  • 31-12-2021
 
NM01 Upgrade the NM systems and develop the associated procedures related to e-FPL
  • 01-01-2016
  • 31-12-2021
 
NM02 Upgrade the NM systems and develop the associated procedures related to FF-ICE/1
  • 01-01-2018
  • 31-12-2021
Code Dates
 
1999 99
2000 00
2001 01
2002 02
2003 03
2004 04
2005 05
2006 06
2007 07
2008 08
2009 09
2010 10
2011 11
2012 12
2013 13
2014 14
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FCM08
 
20160101_20220101
ASP01
 
20180101_20211231
ASP02
 
20180101_20211231
USE01
 
20160101_20211231
USE02
 
20160101_20211231
NM01
 
20160101_20211231
NM02
 
20180101_20211231

Supporting Material

Title Related SLoAs

EUROCONTROL - EAM 4 - ESARR 4 - Risk Assessment and Mitigation in ATM - Edition 1.0 / 04/2001

https://www.eurocontrol.int/publication/esarr-4-risk-assessment-and-mitigation-atm

ASP02

Consultation & Approval

Working Arrangement in charge
NETOPS
Outline description approved in
Latest objective review at expert level
05/2016
Commitment Decision Body
Provisional Council (PC)
Objective approved/endorsed in
09/2016
Latest change to objective approved/endorsed in
09/2017