eATM Portal

AOM-0104-B — Advanced Point-in-Space RNP approaches and departures

Rotorcraft procedures are designed to allow easier IFR access to VFR FATOs, in particular when weather conditions are adverse. Advanced (e.g. curved) SBAS/GBAS guided Point-in-Space RNP approaches towards landing locations and Point-in-Space departures from landing locations are created with connections to/from Low Level IFR route network. The curved segment of the advanced PinS can be placed in the initial, intermediate or missed approach segment.

Rationale
Forecast V3 end date
30-09-2019
Benefits start date (IOC)
19-10-2022
Full benefits date (FOC)
31-12-2026
Current Maturity Level
V3
Solution Data Quality Index
Current Maturity Phase
R&D
Scope
Release
R9
PCP Status

Enablers

Code Dates
 
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
2026 26
2027 27
2028 28
2029 29
2030 30
2031 31
2032 32
2033 33
2034 34
2035 35
2036 36
2037 37
2038 38
2039 39
2040 40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AOM-0104-B
 
A/C-01
V4
V5
IOC - FOC
A/C-04b
V4
V5
IOC - FOC
A/C-05a
IOC - FOC
A/C-06
V4
V5
IOC - FOC
A/C-07
V4
V5
IOC - FOC
PRO-250
V5
IOC - FOC
A/C-02a
V4
V5
IOC - FOC
A/C-23a
IOC - FOC
A/C-83
V4
V5
IOC - FOC
BTNAV-0502
BTNAV-0503
BTNAV-0504
CTE-N07a
IOC - FOC
PRO-251
V5
IOC - FOC
REG-0009
STD-025
STD-043
STD-067
Code Title Related Elements Analysis
A/C-01 Enhanced positioning for LPV/RNP based on Single Frequency SBAS Analysis
A/C-04b Flight management and guidance for RNP 0.3 (Category H(rotorcraft)) in all phases of flight, except final approach and initial missed approach Analysis
A/C-05a APV Barometric VNAV Analysis
A/C-06 Flight management and guidance for LPV approach based on SBAS Analysis
A/C-07 Flight management and guidance for RNP transition to ILS/GLS/LPV Analysis
PRO-250 Rotorcraft procedures for IFR access to VFR FATOs Analysis
A/C-02a Enhanced positioning using GBAS single frequency Analysis
A/C-23a Synthetic vision in low visibility conditions Analysis
A/C-83 Head Mounted Display for PinS procedures Analysis
BTNAV-0502 Update of Minimum Performance Standard for Enhanced Vision (EV) Analysis
BTNAV-0503 New ARP standard for Transport Category Airplane HUD/SVS systems Analysis
BTNAV-0504 Update of Minimum Performance Standard for Airborne Synthetic Vision (SV) Analysis
CTE-N07a GBAS Cat I based on Single-Constellation / Single-Frequency GNSS (GPS L1) Analysis
PRO-251 ATC Procedure to handle SNI IFR rotorcraft operations using PinS Analysis
REG-0009 AMC for Curved Approaches Analysis
STD-025 Harmonisation Specifications on Ground Based Augmentation System Ground Equipment to Support Category I Operations Analysis
STD-043 EN 303 084, Ground Based Augmentation System (GBAS) VHF ground-air Data Broadcast (VDB) Analysis
STD-067 DO-253D 'GBAS MOPS' & DO-246E 'GBAS ICD' Analysis

SESAR Solutions

PCP Elements: No associated data

Implementation Objectives: No associated data

ICAO Block Modules: No associated data