The system supports INAP actors for smoothing flows of traffic and de-conflicting flights across INAP AoR (thus covering a part or the whole of an ATSU AoR).
ATC Planning Control roles are assisted in alleviating traffic complexity, facilitating traffic sequencing, and optimizing traffic flows thanks to:
* Finer ATFCM measures (Smart Trajectory Adjustment Measures), taken in a timeframe particularly close to the time of occurrence of the complexity situation, which allows for more reliable and efficient analysis, better focused measures which are more likely to have the desired impact, without unwanted side effects
* Support to ATCOs on CWPs to facilitate decision making process and implementation of the ATFCM measures (on the basis of Best Effort principle).
Code | Dates |
---|---|
2015
15
2016
16
2017
17
2018
18
2019
19
2020
20
2021
21
2022
22
2023
23
2024
24
2025
25
2026
26
2027
27
2028
28
2029
29
2030
30
2031
31
2032
32
2033
33
2034
34
2035
35
2036
36
2037
37
2038
38
2039
39
2040
40
|
|
|
|
CM-0302 | |
ER APP ATC 17 |
IOC - FOC
|
METEO-06c |
V4
V5
IOC - FOC
|
NIMS-09 |
V4
V5
IOC - FOC
|
SWIM-APS-03b |
|
SWIM-APS-04b |
|
Relationship | Code | Title | Related Elements |
---|---|---|---|
10
Has predecessor
|
CM-0301 | Sector Team Operations Adapted to New Responsibilities in En-Route, 1Planning to 2Tactical Controllers team structure |
Code | Title | Program | Related Elements | Analysis |
---|---|---|---|---|
PJ.09-02 | Integrated Local DCB Processes | SESAR 2020 Wave 1 | Analysis |