eATM Portal

Deployment Scenario Title

Multi-sector planning

Deployment Scenario Description -
Essential Operational Change Fully Dynamic and Optimised Airspace
Maturity Additional SESAR Solutions in deployment
Applicable Operating Environment
Airport Terminal Airspace En-Route Network
       
Timeline
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Performance Contribution of the DS
Capacity Safety Environment Cost-efficiency Operational efficiency
         
Stakeholders affected (at least one enabler to be deployed)
ANSP AO AU Network Manager
Civil Military Civil Military Civil Military
ENR  
SESAR Solutions
Solution Code Solution Title Solution Description Related Elements
#63 Multi Sector Planning Multi-Sector Planning uses 1 Planner-2 Tactical configuration (1P-2T) within controller teams,...
Operational Improvement Steps
OI Step Code OI Step Title OI Step Description Related Elements
CM-0301 Sector Team Operations Adapted to New Responsibilities in En-Route, 1Planning to 2Tactical Controllers team structure New operating procedures are in place enabling the Planning Controller to provide support to 2...
Enablers
Required/
Optional
New/
Inherited
Develop/
Use
Enabler Code Enabler Title Enabler Description Related Elements
ER ATC 95 ATC System Support to Permit a Single Planner Role Associated to Two Adjacent Tactical Roles The en-route ATM system functions are enhanced to allow a single planner role to be associated to...
HUM-004 New staffing configuration / Extended ATC Planner in en-route With the introduction of a new staffing configuration (e.g. Changing from existing 1 Tactical...