eATM Portal

AO-0308 — Enhanced Arrival Procedures using Dual Thresholds (DT)

The Enhanced arrival procedures using Dual Thresholds (DT) is applicable to airports with at least a pair of runways (with the same glide slope, either parallel or divergent but physically dependent [CSPR] in all cases when both used for arrival operations). The DT concept, although not removing the dependency between the runways, will allow to shift further the unique touch down aiming point on one of the runways with the aim of reducing wake vortex separations (possibly leading to increased runway capacity) while reducing noise footprint in the surrounding areas of the airport (environmental benefit).
DT means establishing, on one of the runways, a further runway threshold and aiming point (permanent and unique threshold for arrivals), with corresponding glide slope and runway ground markers, lights and visual aids.
DT is a published procedure designed with a glide slope still parallel to the nominal one operated on the other runway.
Another potential benefit could be an optimization of runway occupancy time (ROT) and/or Taxi-in time.

Rationale
There is an operational need to optimize wake turbulence separations between arrivals while reducing the noise below final approach. This can be done by using a displaced runway threshold (shifting the Touch Down Zone) to run arrival operations on a pair of runways in a Dual Thresholds (DT) concept.
Forecast V3 end date
31-08-2019
Benefits start date (IOC)
31-08-2026
Full benefits date (FOC)
31-08-2030
Current Maturity Level
V2 finalised
Solution Data Quality Index
Current Maturity Phase
R&D
Scope
Release
R9
PCP Status

Enablers

Code Dates
 
2015 15
2016 16
2017 17
2018 18
2019 19
2020 20
2021 21
2022 22
2023 23
2024 24
2025 25
2026 26
2027 27
2028 28
2029 29
2030 30
2031 31
2032 32
2033 33
2034 34
2035 35
2036 36
2037 37
2038 38
2039 39
2040 40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
AO-0308
 
AERODROME-ATC-70
V4
V5
IOC - FOC
APP ATC 116
V4
V5
IOC - FOC
A/C-01
V4
V5
IOC - FOC
A/C-02a
V4
V5
IOC - FOC
A/C-02b
V4
V5
IOC - FOC
A/C-04
V4
V5
IOC - FOC
A/C-04a
V4
V5
IOC - FOC
A/C-05a
IOC - FOC
A/C-06
V4
V5
IOC - FOC
A/C-56a
V4
V5
IOC - FOC
A/C-56b
CTE-N06
V4
V5
IOC - FOC
CTE-N07
V4
V5
IOC - FOC
CTE-N07a
IOC - FOC
CTE-N07b
V4
V5
IOC - FOC
CTE-N07c
IOC - FOC
METEO-04c
V4
V5
IOC - FOC
METEO-05c
V4
V5
IOC - FOC
Code Title Related Elements Analysis
AERODROME-ATC-70 Aerodrome ATC System to support Dual Thresholds operations Analysis
APP ATC 116 APP ATC System to support Dual Thresholds operations Analysis
A/C-01 Enhanced positioning for LPV/RNP based on Single Frequency SBAS Analysis
A/C-02a Enhanced positioning using GBAS single frequency Analysis
A/C-02b Enhanced positioning using multi constellation GNSS dual frequency Analysis
A/C-04 Flight management and guidance for improved lateral navigation in approach via RNP Analysis
A/C-04a Flight management and guidance for Advanced RNP Analysis
A/C-05a APV Barometric VNAV Analysis
A/C-06 Flight management and guidance for LPV approach based on SBAS Analysis
A/C-56a Flight management and guidance for Precision Approach GBAS CATII/III using GPS L1 Analysis
A/C-56b Flight management and guidance to support GBAS CATII/III using dual GNSS Analysis
CTE-N06 Space Based Augmentation System (SBAS) Analysis
CTE-N07 Ground Based Augmentation System (GBAS) Analysis
CTE-N07a GBAS Cat I based on Single-Constellation / Single-Frequency GNSS (GPS L1) Analysis
CTE-N07b GBAS Cat II/III based on Single-Constellation / Single-Frequency GNSS (GPS L1) Analysis
CTE-N07c GBAS Cat II/III based on Multi-Constellation / Multi-Frequency (MCMF) GNSS (GPS + GALILEO / L1 + L5) Analysis
METEO-04c Generate and provide MET information relevant for Airport and approach related operations at short notice ('time to decision' between 3 minutes and 7days) including rotorcraft and RPAS Analysis
METEO-05c Generate and provide MET information relevant for TMA and En-route related operations at short notice ('time to decision' between 3 minutes and 7days), including for low-level IFR operations. Analysis

Dependent OI Steps

Relationship Code Title Related Elements
Has predecessor AO-0328 Optimised Runway Delivery on Final Approach

SESAR Solutions

PCP Elements: No associated data

Implementation Objectives: No associated data