eATM Portal

Deployment Scenario Title

Next generation AMAN for a 4D environment

Deployment Scenario Description Next generation AMAN for a 4D environment: this aims to extend the arrival planning horizon, and to incorporate increasingly complex and high-density environments in which en-route sectors serve more than one airport or more than one TMA, using advanced ground support tools and automation, including with regard to airspace constraints (speed and level restrictions, wind and temperature information). The solution also involves looking at highly integrated airports within the wider context of balancing demand and capacity across the network, and in relation to sharing data between systems.
Essential Operational Change Airport and TMA performance
Maturity In development phase: Key R&D Activities
Applicable Operating Environment
Airport Terminal Airspace En-Route Network
       
Timeline
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Performance Contribution of the DS
Capacity Safety Environment Cost-efficiency Operational efficiency
         
Stakeholders affected (at least one enabler to be deployed)
ANSP AO AU Network Manager
Civil Military Civil Military Civil Military
TWR, APP, ENR, SWIM, AIS, MET TWR, APP, ENR, AIS, MET, SWIM APT Operator APT Operator Scheduled, BA Fixed, BA Rotorcraft, GA, FOC Transport, Fighter, WOC Network Manager
SESAR Solutions
Solution Code Solution Title Solution Description Related Elements
PJ.01-01 Extended Arrival Management with overlapping AMAN operations and interaction with DCB and CTA Extended Arrival Management with overlapping AMAN operations and interaction with DCB integrates...
PJ.01-W2-01 Next generation AMAN for 4D environment This key R&D activity will provide enhancements to the arrival management systems and...
Operational Improvement Steps
OI Step Code OI Step Title OI Step Description Related Elements
TS-0109 Controlled Time of Arrival (CTA) in high density/complexity environment The CTA (Controlled Time of Arrival) is an ATM imposed time constraint on a defined point...
TS-0305-B Arrival Management Extended to En-Route Airspace - impact of overlapping AMAN operations for En Route ATC En-Route sectors are expected to contribute to the arrival sequencing towards multiple TMA...
TS-0315 Arrival Management Systems integrated with DCB To improve the overall efficiency of arrival and airport operations, the Arrival Management...
Enablers
Required/
Optional
New/
Inherited
Develop/
Use
Enabler Code Enabler Title Enabler Description Related Elements
  A/C-11 Flight management and guidance for improved single time constraint achievement (CTA/CTO) Flight management and guidance for improved control loop on a single time constraint (Controlled...
  A/C-31a Controller pilot data link communication (CPDLC) compliant with ATN baseline 2 (FANS 3/C) Data link exchange for ATN/VDL2 baseline 2 (FANS 3/C) i.e. for Departure Clearance,...
  A/C-37a Downlink of trajectory data according to contract terms (ADS-C) compliant to ATN baseline 2 (FANS 3/C) Downlink of trajectory data (waypoints or pseudo waypoints with associated constraints and/or...
AGDLS-ATC-AC-14d New SPR for data link exchange of instructions or clearances related to CTA allocation (4DTRAD) On-going work of WG78/SC214
AGDLS-ATC-AC-15d New IOP for data link exchange of instructions or clearances related to CTA allocation (4DTRAD) On-going work of WG78/SC214
AIMS-23 Enhanced digital data chain to ensure Aeronautical Information data provision to meet full 4D trajectory management requirements Enhanced aeronautical information data provision chain enabling the provision of high quality...
APP ATC 148 System Support For Controlled Time of Arrival (CTA) The arrival manager is modified to be able to sequence and space arrival flights by use of CTA....
APP ATC 158 Enhanced arrival management to cover ground holding at the departure aerodrome Queue management processes including HMI upgraded to take account of longer time horizons and...
APP ATC 162 AMAN Sequence build with integration of constraints applied for DCB/dDCB purposes The Arrival Management sequence will integrate constraints applied for DCB/dDCB purposes,...
BTNAV-STD-02 Navigation Performance in ICAO provisions for Enhanced CTA Update of Doc 4444 PANS-ATM and PBN Manual Doc 9613 for enhanced CTA
ER APP ATC 100 4D Trajectory Management by Synchronization of Air and Ground Trajectories through EPP ATC system updates the planned trajectory with data contained in the EPP.
  ER APP ATC 119 Air/Ground Datalink Communication/Protocols for i4D and Controlled Time of Arrival Enhance the air/ground data communications to support the reception and transmission of messages...
ER APP ATC 149a Air-Ground Datalink Exchange to Support i4D - Extended Projected Profile (EPP) Air/Ground datalink management is modified to support the acquisition of the EPP via ADS-C. The...
  ER APP ATC 149b Air-Ground Datalink Exchange to Support i4D - ETA min/max Air/Ground datalink management is modified to support the acquisition of ETA min/max through ADS-C.
  ER APP ATC 149c Air-Ground Datalink Exchange to Support i4D - Controlled Time of Arrival/Overflight (CTA/CTO) Air/Ground datalink management is modified to support the delivery of CTA/CTO using CPDLC.
ER APP ATC 160 ATC to ATC Flight Data Exchange Using The Flight Object Implement ground-ground flight data exchange between ATC units through the use of Flight Object...
ER ATC 158 Enroute ATC System Share and Display Sequencing Advisories from Multiple AMANs The system integrates information of the Sequencing advisories from Multiple AMAN Systems and...
ER ATC 163 Support to En-route delay absorption for cross-border implementation of arrival sequence The system supports ATCO for smoother En-route delay absorption in C-ATSU prior to traffic being...
PRO-118 ATC Procedures for use of CTA across several AoRs ATC Procedures developed for the use of CTA management involving protocol for coordinating with...
REG-0100 Regulatory Provisions for Datalink Extension (DLS II) Interoperability of data link systems, constituents and associated procedures deployed in a...
SWIM-APS-05a Provision and Consumption of Flight Object Sharing services Provision and Consumption of Flight Object Sharing services (In line with AIRM and ISRM)...
SWIM-INFR-01a High Criticality SWIM Services infrastructure Support and Connectivity. Provision of the additional functionality needed by the individual Stakeholder to support their...
SWIM-NET-01a SWIM Network Point of Presence Provision of the individual stakeholder's point of presence onto the common/interconnected...
METEO-05c Generate and provide MET information relevant for TMA and En-route related operations at short notice ('time to decision' between 3 minutes and 7days), including for low-level IFR operations. The ATM-MET system is acquiring, generating, assembling and providing Meteorological (MET)...
SWIM-SUPT-01a SWIM Supporting Registry Provisions Provision, by specific stakeholders, of Register functionality to support the use of SWIM...
SWIM-SUPT-03a SWIM Supporting Security Provisions Provision, by specific stakeholder(s) of functionality to support the use of Security Keys for...
SWIM-SUPT-05a SWIM Supporting IP Network Bridging Provisions Provision, by specific stakeholders, of the functionality to provide bridging between separate...